Tesla Megacharger locations

Tesla has 9 public Megacharger sites open in 6 states as of November 17, 2026. 47 stalls are live. Another 12 sites are on the way: 2 under construction, 7 with building permits filed, 3 announced.

Updated · checked every day

Open sites
9
Open stalls
47
Under construction
2
Permits filed
7
States
8

Map of Tesla Megachargers

Every site on the map is also listed on this page.

© OpenStreetMap · Sites: ChargingNear.me tracker

Every Tesla Megacharger, by status

Open9 sites
SiteStallsPower per stallHostOpened
Tesla Megacharger Bloomington
18434 Valley Blvd, Bloomington, CA
61.2 MWTeslaJuly 17, 2026
Tesla Megacharger at Flying J Tulare
979 E Paige Ave, Tulare, CA
41.2 MWFlying J #1071October 9, 2026
Tesla Megacharger Vernon
3130 Bandini Blvd, Vernon, CA
61.2 MWTeslaAugust 21, 2026
Tesla Megacharger Conley
1820 Rock Cut Rd, Conley, GA
8not yet publishedTeslaOctober 8, 2026
Tesla Megacharger at Pilot Ellabell
130 Interstate Exchange Way, Ellabell, GA
61.2 MWPilot #1390October 8, 2026
Tesla Megacharger Urbandale
Urbandale, IA
7not yet publishedTeslanot yet published
Tesla Megacharger Hodgkins
Hodgkins, IL
61.2 MWTeslaNovember 10, 2026
Tesla Megacharger Ogallala
Ogallala, NE
21.2 MWTeslanot yet published
Tesla Megacharger Riverdale
Riverdale, UT
2414 kWTeslanot yet published
Under construction2 sites
SiteStallsPower per stallHostExpected
Tesla Megacharger at Pilot North Las Vegas
3812 E Craig Rd, North Las Vegas, NV
not yet published1.2 MWPilot #341not yet published
Tesla Megacharger at Flying J Fort Stockton
2571 N Front St, Fort Stockton, TX
not yet published1.2 MWFlying J #553not yet published
Permit filed7 sites
SiteStallsPower per stallHostPermit completion date
Tesla Megacharger Brookshire
204 Waller Ave, Brookshire, TX
not yet publishednot yet publishedTeslaNovember 23, 2027
Tesla Megacharger Cotulla
921 I-35, Cotulla, TX
not yet publishednot yet publishedTeslaOctober 15, 2027
Tesla Megacharger Houston
12250 FM 529 RD CS, Houston, TX
not yet publishednot yet publishedTeslaJune 25, 2027
Tesla Megacharger Laredo
1011 Beltway Pkwy, Laredo, TX
not yet publishednot yet publishedTeslaJune 18, 2027
Tesla Megacharger Robstown
Robstown, TX
not yet publishednot yet publishedTeslaDecember 1, 2027
Tesla Megacharger San Antonio
1815 N Foster Rd, San Antonio, TX
not yet publishednot yet publishedTeslaMay 18, 2027
Tesla Megacharger Waco
2409 S New Rd, Waco, TX
not yet publishednot yet publishedTeslaSeptember 1, 2027
Announced3 sites
SiteStallsPower per stallHostAnnounced
Tesla Megacharger at Forum Mobility FM Adeline
Oakland, CA
not yet publishednot yet publishedForum Mobility FM AdelineSeptember 17, 2026
Tesla Megacharger at Forum Mobility FM Coliseum
Oakland, CA
not yet publishednot yet publishedForum Mobility FM ColiseumSeptember 17, 2026
Tesla Megacharger at Forum Mobility FM Francis
Ontario, CA
not yet publishednot yet publishedForum Mobility FM FrancisSeptember 17, 2026

What changed this week

3 changes in the 7 days to November 17, 2026.

Every change is in the change log download and its feed.

Fleet depots with Megachargers

These are private depots for the trucks based there. They are listed apart and are not counted with the public sites.

Tesla Megacharger questions

Where are Tesla Megachargers?

As of November 17, 2026, the open public Megacharger sites are in Bloomington (CA), Tulare (CA), Vernon (CA), Conley (GA), Ellabell (GA), Urbandale (IA), Hodgkins (IL), Ogallala (NE) and Riverdale (UT). The full list has every address Tesla or the host has published.

How many Tesla Megachargers are open?

Tesla has 9 public Megacharger sites open in 6 states as of November 17, 2026. 47 stalls are live. Another 12 sites are under construction, permitted or announced (the coming-soon list).

How fast is a Tesla Megacharger?

Each stall delivers up to 1.2 MW, and Tesla says a Semi gets up to 60% of its range in 30 minutes (Pilot Company, October 8, 2026).

Can other electric trucks use a Tesla Megacharger?

Not today. The public Megacharger sites are for the Tesla Semi. Other electric trucks use other networks' heavy-duty sites: the megawatt charging stations list has 29 sites from 6 networks.

How much does it cost to charge at a Megacharger?

Neither Tesla nor a host has published a per-kWh price for Semi drivers as of November 17, 2026. Electrek reported that Tesla takes a fee of $0.08 per kWh at revenue-generating third-party sites (Electrek, May 1, 2026).

Which Pilot and Flying J locations have Megachargers?

Flying J #1071 in Tulare, CA (open), Pilot #1390 in Ellabell, GA (open), Pilot #341 in North Las Vegas, NV (under construction) and Flying J #553 in Fort Stockton, TX (under construction). The Pilot and Flying J page lists their truck-stop amenities.

What is MCS?

MCS is the Megawatt Charging System (SAE J3271), the open plug and protocol for megawatt truck charging. The Tesla Semi charges on MCS 3.2 (Overdrive, February 9, 2026 (updated September 28, 2026)). NREL lists 3 other public sites with the J3271 plug (see them).

How far can a Tesla Semi go on a charge?

About 325 miles for the Standard Range Semi and about 500 miles for the Long Range Semi, both at 82,000 lb gross combined weight (Overdrive, February 9, 2026 (updated September 28, 2026)).

Where is the next Tesla Megacharger opening?

Pilot #341 in North Las Vegas, NV and Flying J #553 in Fort Stockton, TX are under construction; Pilot called its sites near completion (Pilot Company, October 8, 2026). Every site not yet open is listed newest first.

Is there a Tesla Megacharger in my state?

Tesla Megacharger sites are tracked in Texas (8 coming), California (3 open · 3 coming), Georgia (2 open), Illinois (1 open), Iowa (1 open), Nebraska (1 open), Nevada (1 coming) and Utah (1 open).

Sites not counted here

Electrek reported on March 8, 2026 that Tesla opened a Megacharger at 4265 E Guasti Rd in Ontario, California to Semi fleet customers at 750 kW, and that Tesla runs fleet sites at Giga Nevada (Sparks) and in Carson, California. They are not among the public sites on Tesla's map as reported on November 12, 2026, so they are not counted here. Electrek, March 8, 2026

Electrek reported on March 8, 2026 that Tesla added 66 planned Megacharger sites in 15 states to its map in February 2026, including 19 in Texas and 17 in California. Planned sites appear here once Tesla, a host or a public permit record names their place. Electrek, March 8, 2026

How this tracker works

Every day the tracker reads Tesla's Find Us map when it answers, Texas building-permit records (TDLR TABS) for Tesla Megacharger projects, NREL's station data for heavy-duty and MCS sites, Open Charge Map for megawatt sites NREL lacks, and Pilot Company's newsroom and location pages for Pilot and Flying J sites. Tesla's own posts and news reports of Tesla's map are added by hand with their dates. A site shows Open only when Tesla or the site's host confirms it; a permit never makes a site Open. Each site lists every source with its link and date, and the date it was last verified. Download the tracker.

ChargingNear.me is independent and is not affiliated with Tesla. See something wrong? Send a correction.