Chicago to Ogallala truck charging
I-80
3 open Tesla Megacharger sites sit on the Chicago to Ogallala route (I-80) as of November 17, 2026: Hodgkins (IL), Urbandale (IA) and Ogallala (NE). The longest gap between them is 455 road miles, within the Long Range Semi's 500 miles but over the Standard Range's 325 (Overdrive, February 9, 2026 (updated September 28, 2026)).
Updated · checked every day
Gaps between open Megachargers
West from the Chicago freight hub across Iowa and Nebraska on I-80.
- 333 miles
Hodgkins, IL to Urbandale, IA
Long Range Semi only: over the Standard Range's 325 miles - 455 miles
Urbandale, IA to Ogallala, NE
Long Range Semi only: over the Standard Range's 325 miles
Road miles: Stadia Maps routing over OpenStreetMap roads, computed November 16, 2026 (town centres where a site's street address is not published). Semi ranges at 82,000 lb: (Overdrive, February 9, 2026 (updated September 28, 2026)). Weather, grade and load change real range.
Open Megachargers on this route
- Tesla Megacharger HodgkinsOpen Hodgkins, IL 6 stalls1.2 MW per stallTesla Last verified November 12, 2026
- Tesla Megacharger UrbandaleOpen Urbandale, IA 7 stallsTesla Last verified November 12, 2026
- Tesla Megacharger OgallalaOpen Ogallala, NE 2 stalls1.2 MW per stallTesla Last verified November 12, 2026
Map of the Chicago to Ogallala route
Every site on the map is also listed on this page.
Chicago to Ogallala route questions
Can a Tesla Semi drive Chicago to Ogallala on Megachargers?
The Long Range Semi can: the longest gap is 455 road miles, inside its about 500 miles. It is over the Standard Range Semi's about 325 miles (Overdrive, February 9, 2026 (updated September 28, 2026)).
How far apart are the Megachargers on the Chicago to Ogallala route?
Hodgkins to Urbandale: 333 road miles and Urbandale to Ogallala: 455 road miles.
How this tracker works
Every day the tracker reads Tesla's Find Us map when it answers, Texas building-permit records (TDLR TABS) for Tesla Megacharger projects, NREL's station data for heavy-duty and MCS sites, Open Charge Map for megawatt sites NREL lacks, and Pilot Company's newsroom and location pages for Pilot and Flying J sites. Tesla's own posts and news reports of Tesla's map are added by hand with their dates. A site shows Open only when Tesla or the site's host confirms it; a permit never makes a site Open. Each site lists every source with its link and date, and the date it was last verified.
ChargingNear.me is independent and is not affiliated with Tesla. See something wrong? Send a correction.