Tesla Megacharger Hodgkins
OpenHodgkins, IL
Tesla Megacharger Hodgkins (Hodgkins, IL) is open as of November 17, 2026, with 6 stalls at up to 1.2 MW per stall. Tesla Charging on X confirmed it on November 10, 2026.
Updated · checked every day
Tesla has not published this site's street address yet, so there is no directions link. The map pin marks the town.
Site facts
- Status
- Open
- Address
- Hodgkins, IL (Tesla has not published the street address)
- Stalls
- 6
- Power per stall
- 1.2 MW (Drive Tesla Canada, November 12, 2026)
- Host
- Tesla
- Who can charge
- Public, for Tesla Semi
- Plug
- Tesla Megacharger
- Highway
- I-55, about 1 mile away (straight line)
- Opened
- November 10, 2026
- First seen
- November 10, 2026
- Last verified
- November 12, 2026
Nearest other Megachargers
- Tesla Megacharger UrbandaleOpen Urbandale, IA 7 stallsTesla About 306 miles away (straight line)
- Tesla Megacharger ConleyOpen 1820 Rock Cut Rd, Conley, GA 8 stallsTesla About 594 miles away (straight line)
- Tesla Megacharger OgallalaOpen Ogallala, NE 2 stalls1.2 MW per stallTesla About 719 miles away (straight line)
Map: Hodgkins, IL and nearby Megachargers
The site and its nearest Megachargers.
Sources
- New Tesla Megacharger: Hodgkins, IL (6 stalls)Tesla Charging on X · November 10, 2026 · says it is open
- Report on Tesla's Megacharger network nearly doubling, with the sites on Tesla's mapDrive Tesla Canada · November 12, 2026 · says it is open
- Report on the first Tesla Semi deliveries in Chicago and the Hodgkins MegachargerEVWire · November 12, 2026 · says it is open
Change history
- added to the tracker as Open
Hodgkins, IL Megacharger questions
Is the Hodgkins, IL Tesla Megacharger open?
Yes. It is open as of November 17, 2026; it opened on November 10, 2026.
Can any electric truck charge at the Hodgkins, IL Megacharger?
It is a public site for the Tesla Semi. Other electric trucks can use other networks' heavy-duty sites.
Where is the nearest other Tesla Megacharger to Hodgkins?
Tesla Megacharger Urbandale, IA, about 306 miles away in a straight line (open).
How this tracker works
Every day the tracker reads Tesla's Find Us map when it answers, Texas building-permit records (TDLR TABS) for Tesla Megacharger projects, NREL's station data for heavy-duty and MCS sites, Open Charge Map for megawatt sites NREL lacks, and Pilot Company's newsroom and location pages for Pilot and Flying J sites. Tesla's own posts and news reports of Tesla's map are added by hand with their dates. A site shows Open only when Tesla or the site's host confirms it; a permit never makes a site Open. Each site lists every source with its link and date, and the date it was last verified.
ChargingNear.me is independent and is not affiliated with Tesla. See something wrong? Send a correction.