Tesla Megacharger at Flying J Fort Stockton

Under constructionFort Stockton, TX

Tesla Megacharger at Flying J Fort Stockton (2571 N Front St, Fort Stockton, TX) is under construction and not open yet as of November 17, 2026. Near completion and expected to come online soon (Pilot, October 8, 2026).

Updated · checked every day

Site facts

Status
Under construction
Address
2571 N Front St, Fort Stockton, TX 79735
Stalls
not yet published
Power per stall
1.2 MW (Pilot Company (per Tesla), October 8, 2026)
Host
Flying J #553
Who can charge
Public, for Tesla Semi
Plug
Tesla Megacharger
Hours
Open 24 hours
Highway
I-10, Exit 259
First seen
October 8, 2026
Last verified
October 8, 2026

At the Flying J #553

  • Diesel Lanes (8)
  • Showers (9)
  • Truck Parking Spaces (109)
  • ATM (2)
  • DEF Lanes (8)
  • Bulk Propane

From the host's location page. Prices and live counts are not shown; check with the host.

Nearest other Megachargers

Map: Fort Stockton, TX and nearby Megachargers

The site and its nearest Megachargers.

© OpenStreetMap · Sites: ChargingNear.me tracker

Sources

Change history

  • added to the tracker as Under construction

Fort Stockton, TX Megacharger questions

Is the Fort Stockton, TX Tesla Megacharger open?

Not yet. Its status is under construction as of November 17, 2026.

Can any electric truck charge at the Fort Stockton, TX Megacharger?

It is a public site for the Tesla Semi. Other electric trucks can use other networks' heavy-duty sites.

Where is the nearest other Tesla Megacharger to Fort Stockton?

Tesla Megacharger Cotulla, TX, about 277 miles away in a straight line (permit filed).

How this tracker works

Every day the tracker reads Tesla's Find Us map when it answers, Texas building-permit records (TDLR TABS) for Tesla Megacharger projects, NREL's station data for heavy-duty and MCS sites, Open Charge Map for megawatt sites NREL lacks, and Pilot Company's newsroom and location pages for Pilot and Flying J sites. Tesla's own posts and news reports of Tesla's map are added by hand with their dates. A site shows Open only when Tesla or the site's host confirms it; a permit never makes a site Open. Each site lists every source with its link and date, and the date it was last verified.

ChargingNear.me is independent and is not affiliated with Tesla. See something wrong? Send a correction.