Tesla Megacharger at Flying J Fort Stockton
Under constructionFort Stockton, TX
Tesla Megacharger at Flying J Fort Stockton (2571 N Front St, Fort Stockton, TX) is under construction and not open yet as of November 17, 2026. Near completion and expected to come online soon (Pilot, October 8, 2026).
Updated · checked every day
Site facts
- Status
- Under construction
- Address
- 2571 N Front St, Fort Stockton, TX 79735
- Stalls
- not yet published
- Power per stall
- 1.2 MW (Pilot Company (per Tesla), October 8, 2026)
- Host
- Flying J #553
- Who can charge
- Public, for Tesla Semi
- Plug
- Tesla Megacharger
- Hours
- Open 24 hours
- Highway
- I-10, Exit 259
- First seen
- October 8, 2026
- Last verified
- October 8, 2026
At the Flying J #553
- Diesel Lanes (8)
- Showers (9)
- Truck Parking Spaces (109)
- ATM (2)
- DEF Lanes (8)
- Bulk Propane
From the host's location page. Prices and live counts are not shown; check with the host.
Nearest other Megachargers
- Tesla Megacharger CotullaPermit filed 921 I-35, Cotulla, TX Tesla About 277 miles away (straight line)
- Tesla Megacharger San AntonioPermit filed 1815 N Foster Rd, San Antonio, TX Tesla About 288 miles away (straight line)
- Tesla Megacharger LaredoPermit filed 1011 Beltway Pkwy, Laredo, TX Tesla About 303 miles away (straight line)
Map: Fort Stockton, TX and nearby Megachargers
The site and its nearest Megachargers.
Sources
- Pilot and Tesla Open First Megacharger Site, Announce Three Additional Locations Opening SoonPilot Company · October 8, 2026 · says it is under construction
Change history
- added to the tracker as Under construction
Fort Stockton, TX Megacharger questions
Is the Fort Stockton, TX Tesla Megacharger open?
Not yet. Its status is under construction as of November 17, 2026.
Can any electric truck charge at the Fort Stockton, TX Megacharger?
It is a public site for the Tesla Semi. Other electric trucks can use other networks' heavy-duty sites.
Where is the nearest other Tesla Megacharger to Fort Stockton?
Tesla Megacharger Cotulla, TX, about 277 miles away in a straight line (permit filed).
How this tracker works
Every day the tracker reads Tesla's Find Us map when it answers, Texas building-permit records (TDLR TABS) for Tesla Megacharger projects, NREL's station data for heavy-duty and MCS sites, Open Charge Map for megawatt sites NREL lacks, and Pilot Company's newsroom and location pages for Pilot and Flying J sites. Tesla's own posts and news reports of Tesla's map are added by hand with their dates. A site shows Open only when Tesla or the site's host confirms it; a permit never makes a site Open. Each site lists every source with its link and date, and the date it was last verified.
ChargingNear.me is independent and is not affiliated with Tesla. See something wrong? Send a correction.