Tesla Megacharger Brookshire
Permit filedBrookshire, TX
Tesla has a building permit filed for a Megacharger at 204 Waller Ave, Brookshire, TX (Texas record TABS2026028711). It is not open as of November 17, 2026; the permit lists completion by November 23, 2027.
Updated · checked every day
Site facts
- Status
- Permit filed
- Address
- 204 Waller Ave, Brookshire, TX 77423
- Stalls
- not yet published
- Power per stall
- not yet published
- Host
- Tesla
- Who can charge
- Public, for Tesla Semi
- Plug
- Tesla Megacharger
- Highway
- I-10, about 0.1 miles away (straight line)
- Permit
- TABS2026028711 · filed August 25, 2026 · estimated cost $200,000
- Expected completion
- November 23, 2027 (permit record)
- First seen
- August 25, 2026
- Last verified
- November 17, 2026
Nearest other Megachargers
- Tesla Megacharger HoustonPermit filed 12250 FM 529 RD CS, Houston, TX Tesla About 23 miles away (straight line)
- Tesla Megacharger WacoPermit filed 2409 S New Rd, Waco, TX Tesla About 139 miles away (straight line)
- Tesla Megacharger San AntonioPermit filed 1815 N Foster Rd, San Antonio, TX Tesla About 147 miles away (straight line)
Map: Brookshire, TX and nearby Megachargers
The site and its nearest Megachargers.
Sources
- Texas TABS TABS2026028711: Megacharger - Brookshire, TX - Waller, AveTexas Department of Licensing and Regulation (TABS) · August 25, 2026 · permit record
Change history
- added to the tracker as Permit filed
Brookshire, TX Megacharger questions
Is the Brookshire, TX Tesla Megacharger open?
Not yet. Its status is permit filed as of November 17, 2026, with completion expected by November 23, 2027.
Can any electric truck charge at the Brookshire, TX Megacharger?
It is a public site for the Tesla Semi. Other electric trucks can use other networks' heavy-duty sites.
Where is the nearest other Tesla Megacharger to Brookshire?
Tesla Megacharger Houston, TX, about 23 miles away in a straight line (permit filed).
How this tracker works
Every day the tracker reads Tesla's Find Us map when it answers, Texas building-permit records (TDLR TABS) for Tesla Megacharger projects, NREL's station data for heavy-duty and MCS sites, Open Charge Map for megawatt sites NREL lacks, and Pilot Company's newsroom and location pages for Pilot and Flying J sites. Tesla's own posts and news reports of Tesla's map are added by hand with their dates. A site shows Open only when Tesla or the site's host confirms it; a permit never makes a site Open. Each site lists every source with its link and date, and the date it was last verified.
ChargingNear.me is independent and is not affiliated with Tesla. See something wrong? Send a correction.