Tesla Megacharger Conley
OpenConley, GA
Tesla Megacharger Conley (1820 Rock Cut Rd, Conley, GA) is open as of November 17, 2026, with 8 stalls. Tesla Charging on X confirmed it on October 8, 2026.
Updated · checked every day
Site facts
- Status
- Open
- Address
- 1820 Rock Cut Rd, Conley, GA
- Stalls
- 8
- Power per stall
- not yet published
- Host
- Tesla
- Who can charge
- Public, for Tesla Semi
- Plug
- Tesla Megacharger
- Highway
- I-675, about 0.7 miles away (straight line)
- Opened
- October 8, 2026
- First seen
- October 8, 2026
- Last verified
- November 12, 2026
Nearest other Megachargers
- Tesla Megacharger at Pilot EllabellOpen 130 Interstate Exchange Way, Ellabell, GA 6 stalls1.2 MW per stallPilot #1390 About 195 miles away (straight line)
- Tesla Megacharger HodgkinsOpen Hodgkins, IL 6 stalls1.2 MW per stallTesla About 594 miles away (straight line)
- Tesla Megacharger HoustonPermit filed 12250 FM 529 RD CS, Houston, TX Tesla About 711 miles away (straight line)
Map: Conley, GA and nearby Megachargers
The site and its nearest Megachargers.
Sources
- New Tesla Megacharger: Conley, GA (8 stalls)Tesla Charging on X · October 8, 2026 · says it is open
- Report on Tesla's Megacharger network nearly doubling, with the sites on Tesla's mapDrive Tesla Canada · November 12, 2026 · says it is open
- Report on Tesla's first East Coast Megacharger, Conley, GeorgiaDrive Tesla Canada · October 8, 2026 · says it is open
Change history
- added to the tracker as Open
Conley, GA Megacharger questions
Is the Conley, GA Tesla Megacharger open?
Yes. It is open as of November 17, 2026; it opened on October 8, 2026.
Can any electric truck charge at the Conley, GA Megacharger?
It is a public site for the Tesla Semi. Other electric trucks can use other networks' heavy-duty sites.
Where is the nearest other Tesla Megacharger to Conley?
Tesla Megacharger at Pilot Ellabell, GA, about 195 miles away in a straight line (open).
How this tracker works
Every day the tracker reads Tesla's Find Us map when it answers, Texas building-permit records (TDLR TABS) for Tesla Megacharger projects, NREL's station data for heavy-duty and MCS sites, Open Charge Map for megawatt sites NREL lacks, and Pilot Company's newsroom and location pages for Pilot and Flying J sites. Tesla's own posts and news reports of Tesla's map are added by hand with their dates. A site shows Open only when Tesla or the site's host confirms it; a permit never makes a site Open. Each site lists every source with its link and date, and the date it was last verified.
ChargingNear.me is independent and is not affiliated with Tesla. See something wrong? Send a correction.