Tesla Megacharger San Antonio
Permit filedSan Antonio, TX
Tesla has a building permit filed for a Megacharger at 1815 N Foster Rd, San Antonio, TX (Texas record TABS2026014931). It is not open as of November 17, 2026; the permit lists completion by May 18, 2027.
Updated · checked every day
Site facts
- Status
- Permit filed
- Address
- 1815 N Foster Rd, San Antonio, TX 78244
- Stalls
- not yet published
- Power per stall
- not yet published
- Host
- Tesla
- Who can charge
- Public, for Tesla Semi
- Plug
- Tesla Megacharger
- Highway
- I-10, about 0.1 miles away (straight line)
- Permit
- TABS2026014931 · filed March 13, 2026 · estimated cost $400,000
- Expected completion
- May 18, 2027 (permit record)
- First seen
- March 13, 2026
- Last verified
- November 17, 2026
Nearest other Megachargers
- Tesla Megacharger CotullaPermit filed 921 I-35, Cotulla, TX Tesla About 87 miles away (straight line)
- Tesla Megacharger RobstownPermit filed Robstown, TX Tesla About 122 miles away (straight line)
- Tesla Megacharger LaredoPermit filed 1011 Beltway Pkwy, Laredo, TX Tesla About 139 miles away (straight line)
Map: San Antonio, TX and nearby Megachargers
The site and its nearest Megachargers.
Sources
- Texas TABS TABS2026014931: Megacharger - San Antonio, TX - Foster RdTexas Department of Licensing and Regulation (TABS) · March 13, 2026 · permit record
Change history
- added to the tracker as Permit filed
San Antonio, TX Megacharger questions
Is the San Antonio, TX Tesla Megacharger open?
Not yet. Its status is permit filed as of November 17, 2026, with completion expected by May 18, 2027.
Can any electric truck charge at the San Antonio, TX Megacharger?
It is a public site for the Tesla Semi. Other electric trucks can use other networks' heavy-duty sites.
Where is the nearest other Tesla Megacharger to San Antonio?
Tesla Megacharger Cotulla, TX, about 87 miles away in a straight line (permit filed).
How this tracker works
Every day the tracker reads Tesla's Find Us map when it answers, Texas building-permit records (TDLR TABS) for Tesla Megacharger projects, NREL's station data for heavy-duty and MCS sites, Open Charge Map for megawatt sites NREL lacks, and Pilot Company's newsroom and location pages for Pilot and Flying J sites. Tesla's own posts and news reports of Tesla's map are added by hand with their dates. A site shows Open only when Tesla or the site's host confirms it; a permit never makes a site Open. Each site lists every source with its link and date, and the date it was last verified.
ChargingNear.me is independent and is not affiliated with Tesla. See something wrong? Send a correction.