Megawatt (MCS) and heavy-duty truck charging stations
NREL lists 29 public heavy-duty truck charging sites from 6 networks as of November 17, 2026, 19 of them open. 3 sites have the MCS (SAE J3271) megawatt plug. Tesla's 9 open Megacharger sites for the Semi are on the map too.
Updated · checked every day
- Heavy-duty sites
- 29
- Open
- 19
- With MCS plug
- 3
- Networks
- 6
Map of megawatt and heavy-duty charging
Every site on the map is also listed on this page.
Every public heavy-duty site, by status
| Site | Network | Plug | Power | Status |
|---|---|---|---|---|
| Busy Ant Hope Hull, AL | PowerPump | CCS | 180 kW | Open |
| Shell Montgomery Gas Station Montgomery, AL | PowerPump | CCS | 150 kW | Open |
| Chevron Prattville Prattville, AL | PowerPump | CCS | 150 kW | Open |
| Texaco Selma Selma, AL | PowerPump | CCS | 180 kW | Open |
| PowerStation - Rasor Rd Baker, CA | Non-Networked | CCS | 360 kW | Open |
| WattEV - Bakersfield (HWY65) Bakersfield, CA | WattEV | MCS (SAE J3271) | 1.2 MW | Open |
| Greenlane Charging Center Colton, CA | Non-Networked | CCS | 400 kW | Open |
| WattEV - Gardena Gardena, CA | WattEV | CCS | 360 kW | Open |
| WattEV - Port of Long Beach (Pier A) Long Beach, CA | WattEV | CCS | 360 kW | Open |
| WattEV - San Bernardino San Bernardino, CA | WattEV | CCS | 360 kW | Open |
| WattEV - Vernon (Bandini Blvd) Vernon, CA | WattEV | MCS (SAE J3271) | 1.2 MW | Open |
| City of Doral Doral, FL | PowerPump | CCS | 180 kW | Open |
| BP Gas Station Aurora Aurora, IL | PowerPump | CCS | 180 kW | Open |
| Lake County Visitor Center - NIPSCO/GOEVIN Hammond, IN | InCharge | CCS | 150 kW | Open |
| Tuscan Village Salem, NH | TurnOnGreen | CCS | 120 kW | Open |
| EV Edison Charging Hub Kearny, NJ | Non-Networked | CCS | 180 kW | Open |
| Wagon Trail Storage Eureka, NV | TurnOnGreen | CCS | 50 kW | Open |
| Aero Corp Middletown, PA | TurnOnGreen | CCS | 120 kW | Open |
| Rentschler Chevrolet InCharge DC Fast Charger Slatington, PA | EV Connect | CCS | 60 kW | Open |
| WattEV - Taft Bakersfield, CA | WattEV | CCS | 240 kW | Announced |
| WattEV - Blythe Blythe, CA | WattEV | CCS | 240 kW | Announced |
| WattEV - Gustine Gustine, CA | WattEV | CCS | 240 kW | Announced |
| WattEV - Oakland (Edgewater) Oakland, CA | WattEV | MCS (SAE J3271) | 1.2 MW | Announced |
| WattEV - Oxnard (Carnegie St) Oxnard, CA | WattEV | CCS | 240 kW | Announced |
| WattEV - Perris (Harley-Knox) Perris, CA | WattEV | CCS | 240 kW | Announced |
| WattEV - Sacramento Sacramento, CA | WattEV | CCS | 240 kW | Announced |
| Barney's Fuel Ypsilanti, MI | PowerPump | CCS | 300 kW | Announced |
| Koulomb - Nations Ford Road Charlotte, NC | EV Connect | CCS | 360 kW | Announced |
| WattEV - Salem Salem, OR | WattEV | CCS | 240 kW | Announced |
From NREL's station data: sites rated for heavy-duty vehicles with DC fast or MCS charging. Last checked November 17, 2026.
Tesla Megachargers
Tesla has 9 public Megacharger sites open in 6 states as of November 17, 2026. 47 stalls are live. See every Megacharger, or the sites coming soon.
Megawatt charging questions
What is MCS charging?
MCS is the Megawatt Charging System (SAE J3271), the open plug and protocol for megawatt charging of heavy trucks. The Tesla Semi charges on MCS 3.2 (Overdrive, February 9, 2026 (updated September 28, 2026)).
Where are MCS charging stations?
As of November 17, 2026, NREL lists the J3271 plug at WattEV - Bakersfield (HWY65) (Bakersfield, CA, open), WattEV - Vernon (Bandini Blvd) (Vernon, CA, open) and WattEV - Oakland (Edgewater) (Oakland, CA, announced).
Which networks run public heavy-duty truck charging?
PowerPump, Non-Networked, WattEV, InCharge, TurnOnGreen and EV Connect, per NREL, plus Tesla's Megacharger network for the Tesla Semi.
Can other trucks use Tesla Megachargers?
Not today. Tesla's public Megacharger sites are for the Tesla Semi.
How this tracker works
Every day the tracker reads Tesla's Find Us map when it answers, Texas building-permit records (TDLR TABS) for Tesla Megacharger projects, NREL's station data for heavy-duty and MCS sites, Open Charge Map for megawatt sites NREL lacks, and Pilot Company's newsroom and location pages for Pilot and Flying J sites. Tesla's own posts and news reports of Tesla's map are added by hand with their dates. A site shows Open only when Tesla or the site's host confirms it; a permit never makes a site Open. Each site lists every source with its link and date, and the date it was last verified.
ChargingNear.me is independent and is not affiliated with Tesla. See something wrong? Send a correction.