Tesla Superchargers coming soon
As of November 20, 2026, supercharge.info lists 966 U.S. Tesla Supercharger sites in the pipeline: 158 under construction, 96 with a permit filed and 712 planned, across 49 states. 16 opened in the last 7 days and 59 in the last 30.
· read from supercharge.info twice a day
- Under construction
- 158
- Permit filed
- 96
- Planned
- 712
- Opened, last 7 days
- 16
- Opened, last 30 days
- 59
- Third-party, in the pipeline
- 248
- NEVI funded, in the pipeline
- 2
Superchargers in the pipeline
248 sites in the pipeline, third-party owned; showing the first 60, furthest along first. Every site is on its state page (table below).
- Lake Havasu City, AZ - AZ-95Under construction 14875 AZ-95, Lake Havasu City, AZ 500 kWOpen to other EVsThird-party: Love's Under construction since November 8, 2026 · supercharge.info
- Merced, CA - S Coffee StUnder construction 809 S Coffee St, Merced, CA 4 stalls500 kWOpen to other EVsThird-party: Third-party owner not yet named Under construction since October 14, 2026 · supercharge.info
- Denver, CO - S Colorado BlvdUnder construction 1505 S Colorado Blvd, Denver, CO 8 stalls325 kWOpen to other EVsThird-party: GCH Charging Under construction since October 7, 2026 · supercharge.info
- Opa-locka, FLUnder construction 5601 NW 183rd St, Miami Gardens, FL 16 stalls325 kWOpen to other EVsThird-party: Third-party owner not yet named Under construction since September 30, 2026 · supercharge.info
- Tampa, FL - W Cass StUnder construction 1907 W Cass St, Tampa, FL 8 stalls500 kWOpen to other EVsThird-party: Synergy Under construction since September 30, 2026 · supercharge.info
- Topeka, KS - SW Burlingame RdUnder construction 3722 SW Burlingame Rd, Topeka, KS 4 stalls500 kWOpen to other EVsThird-party: FoxDen Energy Under construction since September 22, 2026 · supercharge.info
- Sterling, MAUnder construction 110 Leominster Rd, Sterling, MA 2 stalls250 kWOpen to other EVsThird-party: Third-party owner not yet named Under construction since September 27, 2026 · supercharge.info
- Las Vegas, NV - Boulder HwyUnder construction 6445 Boulder Hwy, Las Vegas, NV 8 stalls325 kWOpen to other EVsThird-party: Third-party owner not yet named Under construction since October 9, 2026 · supercharge.info
- Croton-On-Hudson, NYUnder construction 53 Maple St, Croton-On-Hudson, NY 6 stalls500 kWOpen to other EVsThird-party: EVIO Under construction since July 25, 2026 · supercharge.info
- Millwood, NYUnder construction 238 Saw Mill River Rd, Millwood, NY 12 stalls500 kWOpen to other EVsThird-party: EVIO Under construction since July 25, 2026 · supercharge.info
- New Windsor, NYUnder construction 374 Windsor Hwy, New Windsor, NY 8 stalls500 kWOpen to other EVsThird-party: EVIO Under construction since July 25, 2026 · supercharge.info
- Poughkeepsie, NYUnder construction 2521 South Road, Poughkeepsie, NY 8 stalls500 kWOpen to other EVsThird-party: EVIO Under construction since July 25, 2026 · supercharge.info
- El Reno, OKUnder construction 2810 US-81, El Reno, OK 4 stalls325 kWOpen to other EVsThird-party: Francis Energy Under construction since November 19, 2026 · supercharge.info
- Oklahoma City, OK - NW 23rd StUnder construction 4503 NW 23rd St, Oklahoma City, OK 4 stalls325 kWOpen to other EVsThird-party: Francis Energy Under construction since November 4, 2026 · supercharge.info
- Arlington, TX - Eden RdUnder construction 6914 U.S. 287 Frontage Rd, Arlington, TX 4 stalls500 kWOpen to other EVsThird-party: VIKTA Under construction since November 13, 2026 · supercharge.info
- Burleson, TX - SW Wilshire BlvdUnder construction 1411 SW Wilshire Blvd, Burleson, TX 12 stalls325 kWOpen to other EVsThird-party: Tiger Farms Market Under construction since June 20, 2026 · supercharge.info
- Dallas, TX - S Polk StUnder construction 8702 S Polk St, Dallas, TX 12 stalls325 kWOpen to other EVsThird-party: Victron Energy Under construction since July 9, 2026 · supercharge.info
- Arlington, TX - N Collins StUnder construction 2301 N Collins St, Fort Worth, TX 8 stalls325 kWOpen to other EVsThird-party: Third-party owner not yet named Under construction since September 23, 2026 · supercharge.info
- Grand Prairie, TX - E Mayfield RdUnder construction 3051 E Mayfield Rd, Grand Prairie, TX 8 stalls325 kWOpen to other EVsThird-party: Victron Energy Under construction since September 22, 2026 · supercharge.info
- Houston, TX - 9762 Katy FwyUnder construction 9762 Katy Fwy, Houston, TX 12 stalls250 kWOpen to other EVsThird-party: Maxari Under construction since August 7, 2026 · supercharge.info
- Killeen, TX - E Central Texas ExpyUnder construction 2900 E Central Texas Expy, Killeen, TX 8 stalls325 kWOpen to other EVsThird-party: VIKTA Under construction since September 21, 2026 · supercharge.info
- Mt Pleasant, TXUnder construction 2428 W Ferguson Rd, Mt Pleasant, TX 4 stalls500 kWOpen to other EVsThird-party: Victron Energy Under construction since October 7, 2026 · supercharge.info
- Pflugerville, TXUnder construction 14125 The Lakes Blvd, Pflugerville, TX 4 stalls325 kWOpen to other EVsThird-party: Quantum Unity Under construction since April 17, 2026 · supercharge.info
- Presidio, TXUnder construction 99220 U.S. Hwy 67, Presidio, TX 4 stalls325 kWOpen to other EVsThird-party: Third-party owner not yet named Under construction since September 17, 2026 · supercharge.info
- Prosper, TXUnder construction 1099 N Preston Rd, Prosper, TX 325 kWOpen to other EVsThird-party: Victron Energy Under construction since September 21, 2026 · supercharge.info
- Sachse, TXUnder construction 2900 Merritt Rd, Sachse, TX 8 stalls500 kWOpen to other EVsThird-party: Victron Energy Under construction since November 1, 2026 · supercharge.info
- Weatherford, TXUnder construction 2082 Mineral Wells Hwy, Weatherford, TX 8 stalls325 kWOpen to other EVsThird-party: Victron Energy Under construction since July 4, 2026 · supercharge.info
- Seattle, WA - SW Morgan StUnder construction 4118 SW Morgan St, Seattle, WA 4 stalls325 kWThird-party: Seattle City Light Under construction since March 2, 2026 · supercharge.info
- Armstrong Creek, WIUnder construction 497 US-8, Armstrong Creek, WI 4 stalls325 kWOpen to other EVsThird-party: Universal EV Under construction since September 28, 2026 · supercharge.info
- Lake Elsinore, CA - Dexter AvePermit filed 18611 Dexter Ave, Lake Elsinore, CA 8 stalls500 kWOpen to other EVsThird-party: Trout Electric Permit filed since October 7, 2026 · supercharge.info
- Madison, AL - Hughes RdPlanned 15 Hughes Rd, Madison, AL 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 27, 2026 · supercharge.info
- Mobile, AL - St Joseph StPlanned 212 St Joseph St, Mobile, AL 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 27, 2026 · supercharge.info
- Tuscaloosa, AL - McFarland Blvd EPlanned 3212 McFarland Blvd E, Tuscaloosa, AL 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 27, 2026 · supercharge.info
- Rogers, AR - W Pauline Whitaker PkwyPlanned 5001 W Pauline Whitaker Pkwy, Rogers, AR 500 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 28, 2026 · supercharge.info
- Chandler, AZ - S Gilbert RdPlanned 4041 S Gilbert Rd, Chandler, AZ 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 27, 2026 · supercharge.info
- Eloy, AZ - N Toltec RdPlanned 2950 N Toltec Rd, Eloy, AZ 325 kWOpen to other EVsThird-party: Love's Planned since September 27, 2026 · supercharge.info
- Gila Bend, AZ - W Pima StPlanned 820 W Pima St, Gila Bend, AZ 500 kWOpen to other EVsThird-party: Love's Planned since October 11, 2026 · supercharge.info
- Kingman, AZ - Minerva LnPlanned 6035 Minerva Ln, Kingman, AZ 6 stalls500 kWOpen to other EVsThird-party: Love's Planned since September 27, 2026 · supercharge.info
- Mayer, AZPlanned 14414 S Cross L Rd, Mayer, AZ 325 kWOpen to other EVsThird-party: Love's Planned since September 27, 2026 · supercharge.info
- Arcadia, CAPlanned 1205 S Baldwin Ave, Arcadia, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 28, 2026 · supercharge.info
- Chino, CA - Riverside DrPlanned 6160 Riverside Dr, Chino, CA 8 stalls325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 29, 2026 · supercharge.info
- Diamond Bar, CA - 22628 Golden Springs DrPlanned 22628 Golden Springs Dr, Diamond Bar, CA Open to other EVsThird-party: Third-party owner not yet named Planned since September 22, 2026 · supercharge.info
- Fontana, CA - Slover AvePlanned 17114 Slover Ave, Fontana, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 29, 2026 · supercharge.info
- Fremont, CA - Mission BlvdPlanned 39812 Mission Blvd, Fremont, CA Open to other EVsThird-party: UCN Planned since September 29, 2026 · supercharge.info
- Milpitas, CA - Valley WayPlanned 558 Valley Way, Fremont, CA Open to other EVsThird-party: UCN Planned since September 29, 2026 · supercharge.info
- Fresno, CA - S Chestnut AvePlanned 4131 S Chestnut Ave, Fresno, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 28, 2026 · supercharge.info
- Hayward, CA - Mission BlvdPlanned 27572 Mission Blvd, Hayward, CA Open to other EVsThird-party: UCN Planned since September 29, 2026 · supercharge.info
- Lennox, CAPlanned 10300 La Cienega Blvd, Inglewood, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 28, 2026 · supercharge.info
- Laguna Hills, CA - Alicia PkwyPlanned 24809 Alicia Pkwy, Laguna Hills, CA Open to other EVsThird-party: Third-party owner not yet named Planned since September 22, 2026 · supercharge.info
- Long Beach, CA - Pico AvePlanned 260 Pico Ave, Long Beach, CA 325 kWOpen to other EVsThird-party: Forum Mobility Planned since September 28, 2026 · supercharge.info
- Madera, CA - Golden State BlvdPlanned 3455 Golden State Blvd, Madera, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 28, 2026 · supercharge.info
- Mission Hills, CAPlanned 15555 San Fernando Mission Blvd, Mission Hills, CA 18 stalls325 kWOpen to other EVsThird-party: EV Initiative Planned since June 22, 2026 · supercharge.info
- Orange, CA - S Parker StPlanned 701 S Parker St, Orange, CA Open to other EVsThird-party: Third-party owner not yet named Planned since September 22, 2026 · supercharge.info
- Orange, CA - W Lincoln AvePlanned 416 W Lincoln Ave, Orange, CA Open to other EVsThird-party: Third-party owner not yet named Planned since September 22, 2026 · supercharge.info
- Petaluma, CA - E Washington StPlanned 905 E Washington St, Petaluma, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 28, 2026 · supercharge.info
- Redlands, CA - Orange StPlanned 522 Orange St, Redlands, CA 8 stalls500 kWOpen to other EVsThird-party: EVIO Planned since September 2, 2026 · supercharge.info
- Rowland Heights, CA - Fullerton RdPlanned 1370 Fullerton Rd, Rowland Heights, CA Open to other EVsThird-party: Third-party owner not yet named Planned since September 22, 2026 · supercharge.info
- San Diego, CA - 17th StPlanned 765 17th St, San Diego, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 28, 2026 · supercharge.info
- Presidio, CAPlanned 558 Presidio Blvd, San Francisco, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 29, 2026 · supercharge.info
- Turlock, CA - 2500 Fulkerth RdPlanned 2500 Fulkerth Rd, Turlock, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 29, 2026 · supercharge.info
Map of Superchargers coming soon
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
Every site on the map is also listed on this page.
Opened this week
- Benton, AR1400 AR-229, Benton, AR · 16 stalls · 500 kWOpened November 19, 2026 · source: supercharge.infoStation page
- Snohomish, WA14611 87th Ave SE, Snohomish, WA · 4 stalls · 325 kWOpened November 19, 2026 · source: supercharge.infoStation page
- Des Peres, MO1080 Lindemann Rd, Des Peres, MO · 8 stalls · 325 kWOpened November 18, 2026 · source: supercharge.infoStation page
- Centreville, VA6335 Multiplex Dr, Centreville, VA · 16 stalls · 500 kWOpened November 18, 2026 · source: supercharge.infoStation page
- Spanish Fort, AL30227 Eastern Shore Ct, Spanish Fort, AL · 8 stalls · 325 kWOpened November 17, 2026 · source: supercharge.infoStation page
- Barstow, CA - 1540 E Main St1540 E Main St, Barstow, CA · 16 stalls · 500 kWOpened November 17, 2026 · source: supercharge.infoStation page
- Vacaville, CA - Peabody Rd136 Peabody Rd, Vacaville, CA · 16 stalls · 500 kWOpened November 17, 2026 · source: supercharge.infoStation page
- North Conway, NH - White Mountain Hwy1699 White Mountain Hwy, North Conway, NH · 16 stalls · 325 kWOpened November 17, 2026 · source: supercharge.infoStation page
- Cloverdale, CA421 S Cloverdale Blvd, Cloverdale, CA · 8 stalls · 500 kWOpened November 16, 2026 · source: supercharge.infoStation page
- El Dorado Hills, CA - Vine St2101 Vine St, Folsom, CA · 16 stalls · 500 kWOpened November 16, 2026 · source: supercharge.infoStation page
- Stafford Township, NJ320 NJ-72, Stafford Township, NJ · 8 stalls · 500 kWOpened November 16, 2026 · source: supercharge.infoStation page
- Depew, NY651 Dick Rd, Depew, NY · 12 stalls · 325 kWOpened November 16, 2026 · source: supercharge.infoStation page
- Rochester, NY2301 Lyell Ave, Rochester, NY · 12 stalls · 325 kWOpened November 16, 2026 · source: supercharge.infoStation page
- Murfreesboro, TN - Elam Rd3355 Elam Rd, Murfreesboro, TN · 24 stalls · 500 kWOpened November 16, 2026 · source: supercharge.infoStation page
- Fremont, CA - Blacow Rd41200 Blacow Rd, Fremont, CA · 16 stalls · 500 kWOpened November 13, 2026 · source: supercharge.infoStation page
- Hays, KS - Vine St1902 Vine St, Hays, KS · 16 stalls · 500 kWOpened November 13, 2026 · source: supercharge.infoStation page
What changed
The latest 50 status changes, newest first.
- Streetsboro, OHPlanned → Under constructionSource: supercharge.info
- McAlester, OK - S George Nigh ExpyAdded to supercharge.info as PlannedSource: supercharge.info
- Durant, OK - Choctaw RdAdded to supercharge.info as In Tesla's location voteSource: supercharge.info
- Grant, OKAdded to supercharge.info as PlannedSource: supercharge.info
- El Reno, OKAdded to supercharge.info as Under construction, 4 stallsSource: supercharge.info
- Benton, ARUnder construction → OpenSource: supercharge.info
- Snohomish, WAUnder construction → OpenSource: supercharge.info
- Houston, TX - Hempstead Rd (SC)Open → Open, adding stallsSource: supercharge.info
- Lebanon, TNPermit filed → Under constructionSource: supercharge.info
- Des Peres, MOUnder construction → OpenSource: supercharge.info
- Lawrence, MATemporarily closed → OpenSource: supercharge.info
- Amherst, NYPlanned → Under constructionSource: supercharge.info
- Pendleton, OR - SW 20th StPlanned → Permit filedSource: supercharge.info
- Centreville, VAUnder construction → OpenSource: supercharge.info
- Torrance, CA - 1831 W 190th StAdded to supercharge.info as Planned, 40 stallsSource: supercharge.info
- Clovis, NM - N Prince StAdded to supercharge.info as PlannedSource: supercharge.info
- Barstow, CA - 1540 E Main StUnder construction → OpenSource: supercharge.info
- Spanish Fort, ALUnder construction → OpenSource: supercharge.info
- North Conway, NH - White Mountain HwyUnder construction → OpenSource: supercharge.info
- Vacaville, CA - Peabody RdUnder construction → OpenSource: supercharge.info
- Depew, NYUnder construction → OpenSource: supercharge.info
- Murfreesboro, TN - Elam RdUnder construction → OpenSource: supercharge.info
- Rochester, NYUnder construction → OpenSource: supercharge.info
- El Dorado Hills, CA - Vine StUnder construction → OpenSource: supercharge.info
- Stafford Township, NJUnder construction → OpenSource: supercharge.info
- Cloverdale, CAUnder construction → OpenSource: supercharge.info
- Grove City, OH - Marlane Dr SAdded to supercharge.info as PlannedSource: supercharge.info
- Kalamazoo, MIAdded to supercharge.info as PlannedSource: supercharge.info
- Arlington, TX - Eden RdPermit filed → Under constructionSource: supercharge.info
- Hays, KS - Vine StUnder construction → OpenSource: supercharge.info
- Fremont, CA - Blacow RdUnder construction → OpenSource: supercharge.info
- Hingham, MAAdded to supercharge.info as PlannedSource: supercharge.info
- Manchester, NH - South Willow StUnder construction → OpenSource: supercharge.info
- Jonesboro, AR - E Highland DrUnder construction → OpenSource: supercharge.info
- Salt Lake City, UT - California AveUnder construction → OpenSource: supercharge.info
- Morgantown, WV - University Town Centre DrAdded to supercharge.info as PlannedSource: supercharge.info
- Union, NJ - US-22Under construction → OpenSource: supercharge.info
- Lake Havasu City, AZUnder construction → OpenSource: supercharge.info
- Fort Scott, KSUnder construction → OpenSource: supercharge.info
- Houston, TX - W 34th StUnder construction → OpenSource: supercharge.info
- Ocala, FL - SW 17th CtAdded to supercharge.info as Planned, 16 stallsSource: supercharge.info
- Silver Spring, MDUnder construction → OpenSource: supercharge.info
- Yukon, OKUnder construction → OpenSource: supercharge.info
- Palm City, FLUnder construction → OpenSource: supercharge.info
- The Dalles, OR - W 6th StUnder construction → OpenSource: supercharge.info
- North Las Vegas, NV - N Rancho DrUnder construction → OpenSource: supercharge.info
- Bellingham, WAUnder construction → OpenSource: supercharge.info
- West Memphis, ARUnder construction → OpenSource: supercharge.info
- Carbondale, COUnder construction → OpenSource: supercharge.info
- New Castle, DE - 1515 North Dupont HwyUnder construction → OpenSource: supercharge.info
Superchargers under construction and planned, by state
| State | Under construction | Permit filed | Planned | Opened, last 30 days |
|---|---|---|---|---|
| Alabama | 2 | 0 | 4 | 1 |
| Alaska | 0 | 0 | 1 | 0 |
| Arizona | 5 | 4 | 20 | 4 |
| Arkansas | 0 | 0 | 7 | 3 |
| California | 34 | 24 | 153 | 8 |
| Colorado | 4 | 2 | 19 | 1 |
| Connecticut | 2 | 8 | 13 | 0 |
| Delaware | 1 | 0 | 4 | 1 |
| District of Columbia | 0 | 0 | 0 | 1 |
| Florida | 15 | 9 | 45 | 2 |
| Georgia | 3 | 3 | 27 | 0 |
| Hawaii | 0 | 2 | 5 | 0 |
| Idaho | 1 | 0 | 3 | 0 |
| Illinois | 4 | 1 | 21 | 1 |
| Indiana | 0 | 0 | 4 | 0 |
| Iowa | 0 | 1 | 3 | 0 |
| Kansas | 1 | 0 | 5 | 2 |
| Kentucky | 0 | 0 | 4 | 0 |
| Louisiana | 0 | 1 | 3 | 0 |
| Maine | 1 | 0 | 1 | 0 |
| Maryland | 1 | 1 | 10 | 2 |
| Massachusetts | 3 | 3 | 12 | 0 |
| Michigan | 2 | 1 | 14 | 0 |
| Minnesota | 0 | 0 | 5 | 0 |
| Mississippi | 0 | 0 | 3 | 0 |
| Missouri | 0 | 1 | 10 | 1 |
| Montana | 1 | 0 | 2 | 0 |
| Nebraska | 0 | 0 | 2 | 0 |
| Nevada | 3 | 2 | 10 | 2 |
| New Hampshire | 3 | 0 | 1 | 2 |
| New Jersey | 2 | 3 | 20 | 4 |
| New Mexico | 1 | 0 | 3 | 0 |
| New York | 17 | 2 | 23 | 2 |
| North Carolina | 1 | 3 | 15 | 0 |
| North Dakota | 0 | 0 | 1 | 0 |
| Ohio | 2 | 4 | 15 | 1 |
| Oklahoma | 2 | 0 | 3 | 1 |
| Oregon | 0 | 2 | 17 | 3 |
| Pennsylvania | 1 | 0 | 19 | 0 |
| Puerto Rico | 1 | 0 | 1 | 0 |
| South Carolina | 2 | 1 | 9 | 1 |
| South Dakota | 0 | 0 | 1 | 0 |
| Tennessee | 4 | 5 | 5 | 1 |
| Texas | 29 | 4 | 72 | 6 |
| Utah | 0 | 0 | 17 | 1 |
| Virginia | 3 | 1 | 24 | 3 |
| Washington | 5 | 5 | 28 | 4 |
| West Virginia | 0 | 2 | 3 | 0 |
| Wisconsin | 2 | 1 | 22 | 1 |
| Wyoming | 0 | 0 | 3 | 0 |
| All states | 158 | 96 | 712 | 59 |
As of November 20, 2026. Source: supercharge.info. Each state's page lists every site.
Superchargers coming soon: questions
How many Tesla Superchargers are coming soon?
As of November 20, 2026, supercharge.info lists 966 U.S. Tesla Supercharger sites in the pipeline: 158 under construction, 96 with a permit filed and 712 planned, across 49 states. 16 opened in the last 7 days and 59 in the last 30.
How many Superchargers are under construction?
158 U.S. sites as of November 20, 2026, per supercharge.info. See them by state.
When will a planned Supercharger open?
supercharge.info publishes no opening date for a site in the pipeline, so we do not show one. Each site shows its stage (Planned, Permit filed or Under construction) and the day it reached it. When a site opens, its page says "Opened" with the date and links to its station page, and new Tesla Superchargers lists it for 30 days.
What is a third-party Supercharger?
A Supercharger site owned by another company, such as a fuel retailer, and run on Tesla's network. supercharge.info names the owner in brackets, for example "[Francis Energy] Yukon, OK". 248 third-party sites are in the pipeline as of November 20, 2026. Show only third-party sites.
Which new Superchargers are NEVI funded?
We mark a site NEVI funded only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network. 2 sites in the pipeline match as of November 20, 2026. Show them.
Can other EVs use the new Superchargers?
Where supercharge.info says so. 783 sites in the pipeline are listed as open to other EVs. Show only those sites.
How often is this list updated?
Twice a day, from supercharge.info. Every status shows the day it started and its source; the "What changed" list shows the latest 50.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.