El Dorado Hills, CA - Vine St Tesla Supercharger
OpenFolsom, CA
The Tesla Supercharger in El Dorado Hills, CA - Vine St opened on November 16, 2026, per supercharge.info. supercharge.info lists 16 stalls at up to 500 kW.
· read from supercharge.info twice a day
Opened November 16, 2026 · source: supercharge.info
Site facts
- Status
- Open Opened November 16, 2026 · source: supercharge.info
- Address
- 2101 Vine St, Folsom, CA, 95762
- Stalls
- 16 stalls
- Power
- Up to 500 kW
- Plugs
- 16 NACS (Tesla)
- Open to other EVs
- Yes
- Host
- El Dorado Hills Town Center
- Opened
- November 16, 2026
- Station page
- Live status and directions
- On supercharge.info
- El Dorado Hills, CA - Vine St
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as PlannedSource: supercharge.info
- Planned → Under constructionSource: supercharge.info
- Under construction → OpenSource: supercharge.info
Map: El Dorado Hills, CA - Vine St and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near El Dorado Hills, CA - Vine St today
- Tesla Supercharger Folsom, CA, Vine St2101 Vine St, Folsom, CATesla · 16 fast ports · up to 500 kW · 0.1 mi away
- Raley's3935 Park Dr, EL Dorado Hills, CATesla · 14 fast ports · up to 250 kW · 0.5 mi away
- Hampton Inn & Suites Folsom155 Placerville Dr, Folsom, CAEVOLV_CHARGING · 8 fast ports · up to 50 kW · 2.7 mi away
- Tesla Supercharger220 Palladio Parkway, Folsom, CATesla · 30 fast ports · up to 250 kW · 3.1 mi away
- Bel Air Grocery2760 E Bidwell St, Folsom, CAeVgo Network · 2 fast ports · up to 50 kW · 3.2 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Folsom, CA - E Bidwell StUnder construction E Bidwell St, Folsom, CA 14 stalls325 kWOpen to other EVs Under construction since June 9, 2026 · supercharge.info
- Gold River, CAPlanned 2295 Sunrise Blvd, Gold River, CA 4 stalls250 kW Planned since July 12, 2024 · supercharge.info
- Rancho Cordova, CA - Zinfandel DrPlanned 2800 - 2868 Zinfandel Dr, Rancho Cordova, CA 500 kWOpen to other EVs Planned since October 9, 2026 · supercharge.info
- Roseville, CA - Conference Center DrPlanned 340 Conference Center Dr, Roseville, CA 18 stalls325 kW Planned since December 31, 2024 · supercharge.info
El Dorado Hills, CA - Vine St Supercharger questions
When did the El Dorado Hills, CA - Vine St Supercharger open?
On November 16, 2026, per supercharge.info. See its station page for live status.
How many stalls will the El Dorado Hills, CA - Vine St Supercharger have?
16 stalls at up to 500 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at El Dorado Hills, CA - Vine St?
supercharge.info lists it as open to other EVs.
Where can I fast charge near El Dorado Hills, CA - Vine St today?
Tesla Supercharger Folsom, CA, Vine St (Tesla), about 0.1 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.