Manchester, NH - South Willow St Tesla Supercharger
OpenManchester, NH
The Tesla Supercharger in Manchester, NH - South Willow St opened on November 12, 2026, per supercharge.info. supercharge.info lists 8 stalls at up to 325 kW.
· read from supercharge.info twice a day
Opened November 12, 2026 · source: supercharge.info
Site facts
- Status
- Open Opened November 12, 2026 · source: supercharge.info
- Address
- 1685 S Willow St, Manchester, NH, 03103
- Stalls
- 8 stalls
- Power
- Up to 325 kW
- Plugs
- 8 NACS (Tesla)
- Open to other EVs
- Yes
- Host
- 99 Restaurants
- Opened
- November 12, 2026
- Station page
- Live status and directions
- On supercharge.info
- Manchester, NH - South Willow St
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Planned, 12 stallsSource: supercharge.info
- Planned → Permit filedSource: supercharge.info
- Permit filed → Under constructionSource: supercharge.info
- Under construction → OpenSource: supercharge.info
Map: Manchester, NH - South Willow St and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Manchester, NH - South Willow St today
- Tesla Supercharger Manchester, NH, S Willow St1685 S Willow St, Manchester, NHTesla · 8 fast ports · up to 325 kW · 0.1 mi away
- AutoFair Honda200 Keller Street, Manchester, NHBlink Network · 4 fast ports · up to 60 kW · 0.2 mi away
- AutoFair Hyundai in Manchester1477 S Willow St, Manchester, NHBlink Network · 4 fast ports · up to 60 kW · 0.3 mi away
- The Mall of New Hampshire1500 S Willow St, Manchester, NHMERCEDES_BENZ · 14 fast ports · up to 400 kW · 0.4 mi away
- Quirk GMC Buick NH1250 S Willow St, Manchester, NHChargePoint Network · 2 fast ports · up to 63 kW · 0.7 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Concord, NH - Manchester StUnder construction 30 Manchester St, Concord, NH 8 stalls500 kWOpen to other EVs Under construction since October 1, 2026 · supercharge.info
- Newington, NHPlanned 45 Gosling Rd, Newington, NH 250 kW Planned since January 26, 2025 · supercharge.info
- Burlington, MA - 3rd AvePermit filed 53 3rd Ave, Burlington, MA 8 stalls500 kWOpen to other EVs Permit filed since October 30, 2026 · supercharge.info
- Woburn, MA - Mishawum RdPlanned 300 Mishawum Rd, Woburn, MA 16 stalls325 kWOpen to other EVs Planned since September 22, 2024 · supercharge.info
Manchester, NH - South Willow St Supercharger questions
When did the Manchester, NH - South Willow St Supercharger open?
On November 12, 2026, per supercharge.info. See its station page for live status.
How many stalls will the Manchester, NH - South Willow St Supercharger have?
8 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Manchester, NH - South Willow St?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Manchester, NH - South Willow St today?
Tesla Supercharger Manchester, NH, S Willow St (Tesla), about 0.1 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.