Third-party Supercharger coming to Turlock, CA - 2500 Fulkerth Rd
PlannedThird-party: Third-party owner not yet named
The Tesla Supercharger site in Turlock, CA - 2500 Fulkerth Rd is planned (since September 29, 2026), per supercharge.info. supercharge.info lists up to 325 kW. supercharge.info publishes no opening date. Third-party owner: Third-party owner not yet named.
· read from supercharge.info twice a day
Planned since September 29, 2026 · source: supercharge.info
Site facts
- Status
- Planned Planned since September 29, 2026 · source: supercharge.info
- Address
- 2500 Fulkerth Rd, Turlock, CA, 95380
- Power
- Up to 325 kW
- Open to other EVs
- Yes
- Host
- Circle K
- Third-party owner
- Third-party owner not yet named
- On supercharge.info
- [TBD] Turlock, CA - 2500 Fulkerth Rd
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as PlannedSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Turlock, CA - 2500 Fulkerth Rd and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Turlock, CA - 2500 Fulkerth Rd today
- Tesla Supercharger1680 Countryside Drive, Turlock, CATesla · 16 fast ports · up to 250 kW · 0.1 mi away
- Walmart2111 Fulkerth Road, Turlock, CAElectrify America · 4 fast ports · up to 350 kW · 0.2 mi away
- Tesla Supercharger2800 Fulkerth Rd, Turlock, CATesla · 8 fast ports · up to 325 kW · 0.3 mi away
- Delhi Unified School District16491 Schendel Avenue, Delhi, CAEVCS · 3 fast ports · up to 50 kW · 7.5 mi away
- EVgo EV Charging1240 E Whitmore Ave, Ceres, CAeVgo Network · 2 fast ports · up to 40 kW · 8.2 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Turlock, CA - Hotel DrUnder construction 3101 Hotel Dr, Turlock, CA 16 stalls325 kWOpen to other EVs Under construction since July 1, 2026 · supercharge.info
- Modesto, CA - McHenry AvePlanned 3405 McHenry Ave, Modesto, CA 24 stalls500 kWOpen to other EVs Planned since July 20, 2026 · supercharge.info
- Ripon, CA - Goodwin DrPlanned 1453 Goodwin Dr, Ripon, CA 325 kWOpen to other EVs Planned since May 22, 2025 · supercharge.info
- Merced, CA - S Coffee StUnder construction 809 S Coffee St, Merced, CA 4 stalls500 kWOpen to other EVsThird-party: Third-party owner not yet named Under construction since October 14, 2026 · supercharge.info
Turlock, CA - 2500 Fulkerth Rd Supercharger questions
When will the Turlock, CA - 2500 Fulkerth Rd Supercharger open?
supercharge.info publishes no opening date. Its status is planned since september 29, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.
Can non-Tesla EVs charge at Turlock, CA - 2500 Fulkerth Rd?
supercharge.info lists it as open to other EVs.
Who owns the Turlock, CA - 2500 Fulkerth Rd Supercharger?
A third-party owner not yet named, per the owner bracket in supercharge.info's listing. A third-party site runs on Tesla's Supercharger network.
Where can I fast charge near Turlock, CA - 2500 Fulkerth Rd today?
Tesla Supercharger (Tesla), about 0.1 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.