Tesla Supercharger coming to Turlock, CA - Hotel Dr
Under constructionTurlock, CA
The Tesla Supercharger site in Turlock, CA - Hotel Dr is under construction (since July 1, 2026), per supercharge.info. supercharge.info lists 16 stalls at up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Under construction since July 1, 2026 · source: supercharge.info
Site facts
- Status
- Under construction Under construction since July 1, 2026 · source: supercharge.info
- Address
- 3101 Hotel Dr, Turlock, CA, 95380
- Stalls
- 16 stalls
- Power
- Up to 325 kW
- Plugs
- 16 NACS (Tesla)
- Open to other EVs
- Yes
- Host
- Sizzler
- On supercharge.info
- Turlock, CA - Hotel Dr
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as PlannedSource: supercharge.info
- Planned → Under constructionSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Turlock, CA - Hotel Dr and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Turlock, CA - Hotel Dr today
- Tesla Supercharger1680 Countryside Drive, Turlock, CATesla · 16 fast ports · up to 250 kW · 1.1 mi away
- Tesla Supercharger2800 Fulkerth Rd, Turlock, CATesla · 8 fast ports · up to 325 kW · 1.1 mi away
- Walmart2111 Fulkerth Road, Turlock, CAElectrify America · 4 fast ports · up to 350 kW · 1.2 mi away
- EVgo EV Charging1240 E Whitmore Ave, Ceres, CAeVgo Network · 2 fast ports · up to 40 kW · 7.1 mi away
- Tesla Supercharger1212 Joyce Ave, Modesto, CATesla · 8 fast ports · up to 250 kW · 7.9 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Turlock, CA - 2500 Fulkerth RdPlanned 2500 Fulkerth Rd, Turlock, CA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 29, 2026 · supercharge.info
- Modesto, CA - McHenry AvePlanned 3405 McHenry Ave, Modesto, CA 24 stalls500 kWOpen to other EVs Planned since July 20, 2026 · supercharge.info
- Ripon, CA - Goodwin DrPlanned 1453 Goodwin Dr, Ripon, CA 325 kWOpen to other EVs Planned since May 22, 2025 · supercharge.info
- Merced, CA - S Coffee StUnder construction 809 S Coffee St, Merced, CA 4 stalls500 kWOpen to other EVsThird-party: Third-party owner not yet named Under construction since October 14, 2026 · supercharge.info
Turlock, CA - Hotel Dr Supercharger questions
When will the Turlock, CA - Hotel Dr Supercharger open?
supercharge.info publishes no opening date. Its status is under construction since july 1, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.
How many stalls will the Turlock, CA - Hotel Dr Supercharger have?
16 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Turlock, CA - Hotel Dr?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Turlock, CA - Hotel Dr today?
Tesla Supercharger (Tesla), about 1.1 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.