Tesla Supercharger coming to St Clairsville, OH
Under constructionSt Clairsville, OH
The Tesla Supercharger site in St Clairsville, OH is under construction (since November 5, 2026), per supercharge.info. supercharge.info lists up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Under construction since November 5, 2026 · source: supercharge.info
Site facts
- Status
- Under construction Under construction since November 5, 2026 · source: supercharge.info
- Address
- 107 Plaza Dr, St Clairsville, OH, 43950
- Power
- Up to 325 kW
- Open to other EVs
- Yes
- Host
- Plaza West
- On supercharge.info
- St Clairsville, OH
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as PlannedSource: supercharge.info
- Planned → Under constructionSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: St Clairsville, OH and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near St Clairsville, OH today
- Whiteside Chevrolet GMC50714 National Rd E St, Clairsville, OHRED_E · 2 fast ports · up to 50 kW · 2.4 mi away
- Pilot Travel Center66377 Belmont-Morristown Rd, Belmont, OHeVgo Network · 4 fast ports · up to 350 kW · 7.2 mi away
- Straub Chrysler Dodge Jeep Ram1502 Wheeling Avenue, Glen Dale, WVBlink Network · 2 fast ports · up to 180 kW · 13 mi away
- Elm Grove Chrysler Dodge Jeep Ram2538 National Rd, Wheeling, WVBlink Network · 2 fast ports · up to 180 kW · 14 mi away
- Tesla Supercharger35 Bob Wise Drive, Triadelphia, WVTesla · 4 fast ports · up to 150 kW · 17 mi away
Straight-line distance from the site, from our station database as of November 21, 2026.
Other Superchargers coming nearby
- Coraopolis, PAPlanned 750 Aten Rd, Coraopolis, PA 4 stalls325 kWOpen to other EVsThird-party: Universal EV Planned since September 28, 2026 · supercharge.info
- Morgantown, WV - University Town Centre DrPlanned 5001 University Town Centre Dr, Morgantown, WV 500 kWOpen to other EVs Planned since November 12, 2026 · supercharge.info
- Pittsburgh, PA - The Block NorthwayPlanned 8013 McKnight Rd, Pittsburgh, PA 12 stalls325 kW Planned since May 10, 2025 · supercharge.info
- Bridgeport, WVPermit filed 2800 Meadowbrook Mall Rd, Bridgeport, WV 16 stalls325 kWOpen to other EVs Permit filed since August 11, 2025 · supercharge.info
St Clairsville, OH Supercharger questions
When will the St Clairsville, OH Supercharger open?
supercharge.info publishes no opening date. Its status is under construction since november 5, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.
Can non-Tesla EVs charge at St Clairsville, OH?
supercharge.info lists it as open to other EVs.
Where can I fast charge near St Clairsville, OH today?
Whiteside Chevrolet GMC (RED_E), about 2.4 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.