Third-party Supercharger coming to Coraopolis, PA

PlannedThird-party: Universal EV

The Tesla Supercharger site in Coraopolis, PA is planned (since September 28, 2026), per supercharge.info. supercharge.info lists 4 stalls at up to 325 kW. supercharge.info publishes no opening date. Third-party owner: Universal EV.

· read from supercharge.info twice a day

Planned since September 28, 2026 · source: supercharge.info

Site facts

Status
Planned Planned since September 28, 2026 · source: supercharge.info
Address
750 Aten Rd, Coraopolis, PA, 15108
Stalls
4 stalls
Power
Up to 325 kW
Plugs
4 NACS (Tesla)
Open to other EVs
Yes
Host
Comfort Suites
Third-party owner
Universal EV
On supercharge.info
[Universal EV] Coraopolis, PA
First listed here
November 18, 2026

Timeline

  • Added to supercharge.info as Planned, 4 stallsSource: supercharge.info

Email me when it opens

One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.

Map: Coraopolis, PA and nearby sites

  • Planned or permit filed
  • Under construction
  • Opened in the last 30 days
  • Ring: third-party owned

The site and the nearest sites in the pipeline, all listed on this page.

© OpenStreetMap · Sites: supercharge.info

Open fast chargers near Coraopolis, PA today

  • Target Pittsburgh600 Chauvet Dr, Pittsburgh, PAeVgo Network · 4 fast ports · up to 100 kW · 1 mi away
  • IKEA Store2001 Park Manor Blvd, Pittsburgh, PAElectrify America · 6 fast ports · up to 350 kW · 1.4 mi away
  • Tesla Supercharger2001 Park Manor Blvd, Pittsburgh, PATesla · 16 fast ports · up to 250 kW · 1.4 mi away
  • Cochranauto RBN5200 Campbells Run Rd, Pittsburgh, PAChargePoint Network · 2 fast ports · up to 62 kW · 2 mi away
  • Tesla Supercharger5554 Steubenville Pike, Mckees Rocks, PATesla · 11 fast ports · up to 325 kW · 3.3 mi away

Straight-line distance from the site, from our station database as of November 21, 2026.

Other Superchargers coming nearby

Coraopolis, PA Supercharger questions

When will the Coraopolis, PA Supercharger open?

supercharge.info publishes no opening date. Its status is planned since september 28, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.

How many stalls will the Coraopolis, PA Supercharger have?

4 stalls at up to 325 kW, as supercharge.info lists it on November 21, 2026.

Can non-Tesla EVs charge at Coraopolis, PA?

supercharge.info lists it as open to other EVs.

Who owns the Coraopolis, PA Supercharger?

Universal EV, per the owner bracket in supercharge.info's listing. A third-party site runs on Tesla's Supercharger network.

Where can I fast charge near Coraopolis, PA today?

Target Pittsburgh (eVgo Network), about 1 mi away in a straight line.

Where this comes from

Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.

ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.