Tesla Supercharger coming to Dublin, GA - US-441
PlannedDublin, GA
The Tesla Supercharger site in Dublin, GA - US-441 is planned (since October 5, 2026), per supercharge.info. supercharge.info lists up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Planned since October 5, 2026 · source: supercharge.info
Site facts
- Status
- Planned Planned since October 5, 2026 · source: supercharge.info
- Address
- 2141 US-441, Dublin, GA, 31021
- Power
- Up to 325 kW
- Open to other EVs
- Yes
- Host
- QuikTrip
- On supercharge.info
- Dublin, GA - US-441
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as PlannedSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Dublin, GA - US-441 and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Dublin, GA - US-441 today
- Georgia Power Dublin2175 US-441, Dublin, GAChargePoint Network · 2 fast ports · up to 160 kW · 0.2 mi away
- Tesla Supercharger2172 US-441, Dublin, GATesla · 12 fast ports · up to 250 kW · 0.2 mi away
- RaceTrac EV Charging2262 S Highway 441, Dublin, GARACETRAC · 8 fast ports · up to 180 kW · 0.7 mi away
- Dublin Three2042 Veterans Blvd, Dublin, GAEV Connect · 1 fast port · up to 50 kW · 3.5 mi away
- Nissan2046 Veterans Blvd, Dublin, GANon-Networked · 1 fast port · up to 50 kW · 3.5 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Bonaire, GAPlanned 774 SR 96, Bonaire, GA 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since October 3, 2026 · supercharge.info
- Waycross, GAPlanned 2501 Memorial Dr, Waycross, GA 12 stalls325 kWOpen to other EVs Planned since July 3, 2025 · supercharge.info
- Pooler, GA - 1000 US-80Under construction 1000 US-80, Pooler, GA 16 stalls325 kWOpen to other EVs Under construction since September 24, 2026 · supercharge.info
- Hardeeville, SC - Brooks Willis DrPlanned 131 Brooks Willis Dr, Hardeeville, SC 8 stalls325 kW Planned since September 20, 2024 · supercharge.info
Dublin, GA - US-441 Supercharger questions
When will the Dublin, GA - US-441 Supercharger open?
supercharge.info publishes no opening date. Its status is planned since october 5, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.
Can non-Tesla EVs charge at Dublin, GA - US-441?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Dublin, GA - US-441 today?
Georgia Power Dublin (ChargePoint Network), about 0.2 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.