Tesla Supercharger coming to Pooler, GA - 1000 US-80

Under constructionPooler, GA

The Tesla Supercharger site in Pooler, GA - 1000 US-80 is under construction (since September 24, 2026), per supercharge.info. supercharge.info lists 16 stalls at up to 325 kW. supercharge.info publishes no opening date.

· read from supercharge.info twice a day

Under construction since September 24, 2026 · source: supercharge.info

Site facts

Status
Under construction Under construction since September 24, 2026 · source: supercharge.info
Address
1000 US-80, Pooler, GA, 31322
Stalls
16 stalls
Power
Up to 325 kW
Plugs
16 NACS (Tesla)
Open to other EVs
Yes
Host
Cracker Barrel Old Country Store
On supercharge.info
Pooler, GA - 1000 US-80
First listed here
November 18, 2026

Timeline

Email me when it opens

One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.

Map: Pooler, GA - 1000 US-80 and nearby sites

  • Planned or permit filed
  • Under construction
  • Opened in the last 30 days
  • Ring: third-party owned

The site and the nearest sites in the pipeline, all listed on this page.

© OpenStreetMap · Sites: supercharge.info

Open fast chargers near Pooler, GA - 1000 US-80 today

  • Tesla Supercharger907 US-80, Pooler, GATesla · 11 fast ports · up to 250 kW · 0.2 mi away
  • Tanger Outlets200 Tanger Outlets Boulevard, Pooler, GAJolt · 2 fast ports · up to 50 kW · 1.5 mi away
  • Jolt EV Charging200 Tanger Outlets Blvd, Pooler, GAJolt · 3 fast ports · up to 50 kW · 1.5 mi away
  • Rivian Adventure EV Charging200 Tanger Outlets Boulevard, Pooler, GARIVIAN_ADVENTURE · 6 fast ports · up to 300 kW · 1.8 mi away
  • Tesla Supercharger439 Pooler Pkwy, Pooler, GATesla · 8 fast ports · up to 250 kW · 1.8 mi away

Straight-line distance from the site, from our station database as of November 20, 2026.

Other Superchargers coming nearby

Pooler, GA - 1000 US-80 Supercharger questions

When will the Pooler, GA - 1000 US-80 Supercharger open?

supercharge.info publishes no opening date. Its status is under construction since september 24, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.

How many stalls will the Pooler, GA - 1000 US-80 Supercharger have?

16 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.

Can non-Tesla EVs charge at Pooler, GA - 1000 US-80?

supercharge.info lists it as open to other EVs.

Where can I fast charge near Pooler, GA - 1000 US-80 today?

Tesla Supercharger (Tesla), about 0.2 mi away in a straight line.

Where this comes from

Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.

ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.