Tesla Supercharger coming to Wheeling, IL

PlannedWheeling, IL

The Tesla Supercharger site in Wheeling, IL is planned (since May 14, 2025), per supercharge.info. supercharge.info lists 16 stalls at up to 325 kW. supercharge.info publishes no opening date.

· read from supercharge.info twice a day

Planned since May 14, 2025 · source: supercharge.info

Site facts

Status
Planned Planned since May 14, 2025 · source: supercharge.info
Address
375 W Dundee Rd, Wheeling, IL, 60090
Stalls
16 stalls
Power
Up to 325 kW
Plugs
16 NACS (Tesla)
Open to other EVs
Yes
Host
Wheeling Town Center
On supercharge.info
Wheeling, IL
First listed here
November 18, 2026

Timeline

  • Added to supercharge.info as Planned, 16 stallsSource: supercharge.info

Email me when it opens

One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.

Map: Wheeling, IL and nearby sites

  • Planned or permit filed
  • Under construction
  • Opened in the last 30 days
  • Ring: third-party owned

The site and the nearest sites in the pipeline, all listed on this page.

© OpenStreetMap · Sites: supercharge.info

Open fast chargers near Wheeling, IL today

  • Woodman's BG East1550 Deerfield Parkway, Buffalo Grove, ILTesla · 12 fast ports · up to 250 kW · 2.1 mi away
  • EV Connect EV Charging801 W Dundee Rd, Arlington Heights, ILEV Connect · 4 fast ports · up to 120 kW · 3.4 mi away
  • Arlington Acura of Palatine1275 East Dundee Road, Palatine, ILBlink Network · 4 fast ports · up to 60 kW · 4.5 mi away
  • NorthWest Electric600 E Rand Rd, Mount Prospect, ILNOODOE · 4 fast ports · up to 360 kW · 4.5 mi away
  • ChargePoint EV Charging2015 N Rand Rd, Palatine, ILChargePoint Network · 1 fast port · up to 40 kW · 5.3 mi away

Straight-line distance from the site, from our station database as of November 20, 2026.

Other Superchargers coming nearby

Wheeling, IL Supercharger questions

When will the Wheeling, IL Supercharger open?

supercharge.info publishes no opening date. Its status is planned since may 14, 2025. This page will say "Opened" with the date when it opens, and you can get one email then.

How many stalls will the Wheeling, IL Supercharger have?

16 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.

Can non-Tesla EVs charge at Wheeling, IL?

supercharge.info lists it as open to other EVs.

Where can I fast charge near Wheeling, IL today?

Woodman's BG East (Tesla), about 2.1 mi away in a straight line.

Where this comes from

Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.

ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.