Tesla Supercharger coming to Weston, FL
Under constructionWeston, FL
The Tesla Supercharger site in Weston, FL is under construction (since May 30, 2026), per supercharge.info. supercharge.info lists 16 stalls at up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Under construction since May 30, 2026 · source: supercharge.info
Site facts
- Status
- Under construction Under construction since May 30, 2026 · source: supercharge.info
- Address
- 2210 Weston Rd, Weston, FL, 33326
- Stalls
- 16 stalls
- Power
- Up to 325 kW
- Plugs
- 16 NACS (Tesla)
- Open to other EVs
- Yes
- Host
- Waterway Shoppes of Weston
- On supercharge.info
- Weston, FL
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Permit filed, 8 stallsSource: supercharge.info
- Permit filed → PlannedSource: supercharge.info
- Planned → Under constructionSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Weston, FL and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Weston, FL today
- EV Charging Station3650 Weston Rd, Weston, FLNon-Networked · 1 fast port · up to 50 kW · 1.4 mi away
- 7Charge EV Charging4490 Weston Rd, Davie, FL7CHARGE · 4 fast ports · up to 180 kW · 2 mi away
- synergEV EV Charging14501 W Sunrise Blvd, Sunrise, FLSYNERGEV · 6 fast ports · up to 240 kW · 4.3 mi away
- Coquina Plaza15701 Sheridan Street, Southwest Ranches, FLElectrify America · 3 fast ports · up to 350 kW · 4.3 mi away
- Fountain Square15840 Pines Blvd, Pembroke Pines, FLFPLEV · 5 fast ports · up to 180 kW · 5.9 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Pembroke Pines, FL - NW 150th AveUnder construction 1960 NW 150th Ave, Pembroke Pines, FL 20 stalls325 kWOpen to other EVs Under construction since May 30, 2026 · supercharge.info
- Miramar, FLPlanned 16901 Miramar Pkwy, Miramar, FL 12 stalls325 kWOpen to other EVs Planned since May 12, 2025 · supercharge.info
- Opa-locka, FLUnder construction 5601 NW 183rd St, Miami Gardens, FL 16 stalls325 kWOpen to other EVsThird-party: Third-party owner not yet named Under construction since September 30, 2026 · supercharge.info
- Miami, FL - NE 167th StUnder construction 590 NE 167th St, Miami, FL 8 stalls325 kWOpen to other EVs Under construction since March 5, 2026 · supercharge.info
Weston, FL Supercharger questions
When will the Weston, FL Supercharger open?
supercharge.info publishes no opening date. Its status is under construction since may 30, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.
How many stalls will the Weston, FL Supercharger have?
16 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Weston, FL?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Weston, FL today?
EV Charging Station (Non-Networked), about 1.4 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.