Tesla Supercharger coming to Ventura, CA - Telephone Rd
PlannedVentura, CA
The Tesla Supercharger site in Ventura, CA - Telephone Rd is planned (since December 1, 2024), per supercharge.info. supercharge.info lists 12 stalls at up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Planned since December 1, 2024 · source: supercharge.info
Site facts
- Status
- Planned Planned since December 1, 2024 · source: supercharge.info
- Address
- 5722 Telephone Rd, Ventura, CA, 93003
- Stalls
- 12 stalls
- Power
- Up to 325 kW
- Plugs
- 12 NACS (Tesla)
- Open to other EVs
- Yes
- Host
- Ventura Village
- On supercharge.info
- Ventura, CA - Telephone Rd
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Planned, 12 stallsSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Ventura, CA - Telephone Rd and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Ventura, CA - Telephone Rd today
- Ventura County Credit Union Telephone Road6026 Telephone Rd, Ventura, CAElectrify America · 6 fast ports · up to 350 kW · 0.2 mi away
- Paradise Chevrolet6350 Leland St, Ventura, CANon-Networked · 1 fast port · up to 25 kW · 1.3 mi away
- Tesla Supercharger4095 Telegraph Rd, Ventura, CATesla · 12 fast ports · up to 250 kW · 1.7 mi away
- US Bank Ventura576 S Mills Road, Ventura, CAEVCS · 1 fast port · up to 50 kW · 1.8 mi away
- Rivian Adventure EV Charging3301 E. Main Street, Ventura, CARIVIAN_ADVENTURE · 8 fast ports · up to 300 kW · 2.1 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Ventura, CA - Telegraph RdPlanned 5950 Telegraph Rd, Ventura, CA 325 kWOpen to other EVs Planned since February 27, 2025 · supercharge.info
- Oxnard, CA - S Oxnard BlvdPermit filed 858 S Oxnard Blvd, Oxnard, CA 7 stalls250 kW Permit filed since March 25, 2024 · supercharge.info
- Carpinteria, CAPlanned 5412 Carpinteria Ave, Carpinteria, CA 325 kWOpen to other EVs Planned since March 4, 2025 · supercharge.info
- Santa Barbara, CA - E Cabrillo BlvdPlanned 1809 E Cabrillo Blvd, Santa Barbara, CA 8 stalls325 kWOpen to other EVs Planned since September 16, 2025 · supercharge.info
Ventura, CA - Telephone Rd Supercharger questions
When will the Ventura, CA - Telephone Rd Supercharger open?
supercharge.info publishes no opening date. Its status is planned since december 1, 2024. This page will say "Opened" with the date when it opens, and you can get one email then.
How many stalls will the Ventura, CA - Telephone Rd Supercharger have?
12 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Ventura, CA - Telephone Rd?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Ventura, CA - Telephone Rd today?
Ventura County Credit Union Telephone Road (Electrify America), about 0.2 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.