Tesla Supercharger coming to Torrey, UT

PlannedTorrey, UT

The Tesla Supercharger site in Torrey, UT is planned (since May 13, 2025), per supercharge.info. supercharge.info lists 8 stalls at up to 325 kW. supercharge.info publishes no opening date.

· read from supercharge.info twice a day

Planned since May 13, 2025 · source: supercharge.info

Site facts

Status
Planned Planned since May 13, 2025 · source: supercharge.info
Address
675 UT-24, Torrey, UT, 84775
Stalls
8 stalls
Power
Up to 325 kW
Plugs
8 NACS (Tesla)
Open to other EVs
Yes
Host
Taft Travel Plaza
On supercharge.info
Torrey, UT
First listed here
November 18, 2026

Timeline

  • Added to supercharge.info as Planned, 8 stallsSource: supercharge.info

Email me when it opens

One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.

Map: Torrey, UT and nearby sites

  • Planned or permit filed
  • Under construction
  • Opened in the last 30 days
  • Ring: third-party owned

The site and the nearest sites in the pipeline, all listed on this page.

© OpenStreetMap · Sites: supercharge.info

Open fast chargers near Torrey, UT today

  • RMP Ivie CreekUt-76 Fr2523, Salina, UTElectrify America · 4 fast ports · up to 350 kW · 31 mi away
  • Walmart10 E. 1300 S, Richfield, UTElectrify America · 4 fast ports · up to 350 kW · 48 mi away
  • State of Utah Richfield So210 W 800 S, Richfield, UTChargePoint Network · 2 fast ports · up to 94 kW · 49 mi away
  • Tesla Supercharger1050 W 1250 S, Richfield, UTTesla · 16 fast ports · up to 250 kW · 49 mi away
  • EV Connect EV Charging275 N Main St, Richfield, UTEV Connect · 1 fast port · up to 50 kW · 49 mi away

Straight-line distance from the site, from our station database as of November 20, 2026.

Other Superchargers coming nearby

Torrey, UT Supercharger questions

When will the Torrey, UT Supercharger open?

supercharge.info publishes no opening date. Its status is planned since may 13, 2025. This page will say "Opened" with the date when it opens, and you can get one email then.

How many stalls will the Torrey, UT Supercharger have?

8 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.

Can non-Tesla EVs charge at Torrey, UT?

supercharge.info lists it as open to other EVs.

Where can I fast charge near Torrey, UT today?

RMP Ivie Creek (Electrify America), about 31 mi away in a straight line.

Where this comes from

Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.

ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.