Tesla Supercharger coming to Roswell, NM
PlannedRoswell, NM
The Tesla Supercharger site in Roswell, NM is planned (since January 25, 2025), per supercharge.info. supercharge.info lists 8 stalls at up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Planned since January 25, 2025 · source: supercharge.info
Site facts
- Status
- Planned Planned since January 25, 2025 · source: supercharge.info
- Address
- 2110 N Main St, Roswell, NM, 88201
- Stalls
- 8 stalls
- Power
- Up to 325 kW
- Plugs
- 8 NACS (Tesla)
- Open to other EVs
- Yes
- Host
- Whataburger
- Hours
- 24/7
- On supercharge.info
- Roswell, NM
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Planned, 8 stallsSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Roswell, NM and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Roswell, NM today
- Allsups2515 W 2nd St, Roswell, NMFCN · 4 fast ports · up to 150 kW · 2.6 mi away
- Roswell Roswelldc34507 W 2nd St, Roswell, NMChargePoint Network · 4 fast ports · up to 125 kW · 4.2 mi away
- La Panthers700 Broadway Street, Lake Arthur, NMChargePoint Network · 1 fast port · up to 63 kW · 31 mi away
- BPA at FLETC190 Gun Powder Blvd, Artesia, NMEVGATEWAY · 2 fast ports · up to 150 kW · 38 mi away
- Allsups1600 N 1st St, Artesia, NMFCN · 4 fast ports · up to 150 kW · 39 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Clovis, NM - N Prince StPlanned 2809 N Prince St, Clovis, NM 500 kWOpen to other EVs Planned since November 17, 2026 · supercharge.info
- Lubbock, TX - Iola AvePlanned 2923 Iola Ave, Lubbock, TX 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 22, 2026 · supercharge.info
Roswell, NM Supercharger questions
When will the Roswell, NM Supercharger open?
supercharge.info publishes no opening date. Its status is planned since january 25, 2025. This page will say "Opened" with the date when it opens, and you can get one email then.
How many stalls will the Roswell, NM Supercharger have?
8 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Roswell, NM?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Roswell, NM today?
Allsups (FCN), about 2.6 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.