Tesla Supercharger coming to Renton, WA

Under constructionRenton, WA

The Tesla Supercharger site in Renton, WA is under construction (since April 16, 2026), per supercharge.info. supercharge.info lists 24 stalls at up to 325 kW. supercharge.info publishes no opening date.

· read from supercharge.info twice a day

Under construction since April 16, 2026 · source: supercharge.info

Site facts

Status
Under construction Under construction since April 16, 2026 · source: supercharge.info
Address
800 Garden Ave N, Renton, WA, 98057
Stalls
24 stalls
Power
Up to 325 kW
Plugs
24 NACS (Tesla)
Open to other EVs
Yes
Host
WinCo Foods
On supercharge.info
Renton, WA
First listed here
November 18, 2026

Timeline

Email me when it opens

One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.

Map: Renton, WA and nearby sites

  • Planned or permit filed
  • Under construction
  • Opened in the last 30 days
  • Ring: third-party owned

The site and the nearest sites in the pipeline, all listed on this page.

© OpenStreetMap · Sites: supercharge.info

Open fast chargers near Renton, WA today

  • Target1215 N Landing Way, Renton, WAElectrify America · 3 fast ports · up to 350 kW · 0.1 mi away
  • Renton, WA Rechargery Relay101 S 2nd Street, Renton, WAIONNA · 12 fast ports · up to 400 kW · 1.5 mi away
  • Central Highlands Plaza4601 NE Sunset Blvd., Renton, WAeVgo Network · 6 fast ports · up to 350 kW · 2 mi away
  • Soundfordelec25101 Southwest Grady Wy, Renton, WAChargePoint Network · 2 fast ports · up to 120 kW · 2.2 mi away
  • Brotherton Cadillac Buick GMC.215 Southwest 12th Street, Renton, WABlink Network · 2 fast ports · up to 60 kW · 2.2 mi away

Straight-line distance from the site, from our station database as of November 20, 2026.

Other Superchargers coming nearby

Renton, WA Supercharger questions

When will the Renton, WA Supercharger open?

supercharge.info publishes no opening date. Its status is under construction since april 16, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.

How many stalls will the Renton, WA Supercharger have?

24 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.

Can non-Tesla EVs charge at Renton, WA?

supercharge.info lists it as open to other EVs.

Where can I fast charge near Renton, WA today?

Target (Electrify America), about 0.1 mi away in a straight line.

Where this comes from

Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.

ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.