Third-party Supercharger coming to Norton, VA
PlannedThird-party: Universal EV
The Tesla Supercharger site in Norton, VA is planned (since September 24, 2026), per supercharge.info. supercharge.info lists up to 325 kW. supercharge.info publishes no opening date. Third-party owner: Universal EV.
· read from supercharge.info twice a day
Planned since September 24, 2026 · source: supercharge.info
Site facts
- Status
- Planned Planned since September 24, 2026 · source: supercharge.info
- Address
- 551 Hwy 58 E, Norton, VA, 24273
- Power
- Up to 325 kW
- Open to other EVs
- Yes
- Host
- Econo Lodge Inn & Suites Norton - Wise South
- Third-party owner
- Universal EV
- On supercharge.info
- [Universal EV] Norton, VA
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as PlannedSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Norton, VA and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Norton, VA today
- Food City Wise207 Woodland Dr SW, Wise, VANon-Networked · 1 fast port · up to 150 kW · 2.7 mi away
- Holstonelectric Church219 S Central Ave, Church Hill, TNChargePoint Network · 2 fast ports · up to 125 kW · 30 mi away
- Btes392 Pinnacle Pkwy, Bristol, TNChargePoint Network · 4 fast ports · up to 125 kW · 31 mi away
- Tesla Supercharger416 Pinnacle Parkway, Bristol, TNTesla · 8 fast ports · up to 150 kW · 31 mi away
- Hyundai Bristol2622 W State St, Bristol, TNChargePoint Network · 1 fast port · up to 63 kW · 32 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Abingdon, VA - Cook StPlanned 151 Cook Street, Abingdon, VA Open to other EVs Planned since March 6, 2026 · supercharge.info
- Boone, NC - Blowing Rock RdPlanned 1601 Blowing Rock Rd, Boone, NC Open to other EVs Planned since September 28, 2026 · supercharge.info
- Knoxville, TN - Cracker Barrel LnUnder construction 1510 Cracker Barrel Ln, Knoxville, TN 8 stalls500 kWOpen to other EVs Under construction since August 27, 2026 · supercharge.info
- Wilkesboro, NCPlanned 1301 Westwood Ln, Wilkesboro, NC 8 stalls325 kWOpen to other EVs Planned since January 25, 2025 · supercharge.info
Norton, VA Supercharger questions
When will the Norton, VA Supercharger open?
supercharge.info publishes no opening date. Its status is planned since september 24, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.
Can non-Tesla EVs charge at Norton, VA?
supercharge.info lists it as open to other EVs.
Who owns the Norton, VA Supercharger?
Universal EV, per the owner bracket in supercharge.info's listing. A third-party site runs on Tesla's Supercharger network.
Where can I fast charge near Norton, VA today?
Food City Wise (Non-Networked), about 2.7 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.