Third-party Supercharger coming to Merrill, WI

PlannedThird-party: Universal EV

The Tesla Supercharger site in Merrill, WI is planned (since October 10, 2026), per supercharge.info. supercharge.info lists 4 stalls at up to 325 kW. supercharge.info publishes no opening date. Third-party owner: Universal EV.

· read from supercharge.info twice a day

Planned since October 10, 2026 · source: supercharge.info

Site facts

Status
Planned Planned since October 10, 2026 · source: supercharge.info
Address
200 S Pine Ridge Ave, Merrill, WI, 54452
Stalls
4 stalls
Power
Up to 325 kW
Plugs
4 NACS (Tesla) · 4 CCS · 1 stall with more than one plug type
Open to other EVs
Yes
Host
Travelodge
Third-party owner
Universal EV
On supercharge.info
[Universal EV] Merrill, WI
First listed here
November 18, 2026

Timeline

  • Added to supercharge.info as Planned, 4 stallsSource: supercharge.info

Email me when it opens

One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.

Map: Merrill, WI and nearby sites

  • Planned or permit filed
  • Under construction
  • Opened in the last 30 days
  • Ring: third-party owned

The site and the nearest sites in the pipeline, all listed on this page.

© OpenStreetMap · Sites: supercharge.info

Open fast chargers near Merrill, WI today

  • BPC3000 E Main St, Merrill, WIChargePoint Network · 2 fast ports · up to 160 kW · 0.3 mi away
  • Kocourek Ford2727 N 20th Ave, Wausau, WIFORD_CHARGE · 4 fast ports · up to 240 kW · 13 mi away
  • Kwik Trip1440 W Campus Dr, Wausau, WIKWIK_CHARGE · 4 fast ports · up to 400 kW · 13 mi away
  • O'Malley Automotive3405 W. Stewart Avenue, Wausau, WIEV Connect · 2 fast ports · up to 50 kW · 16 mi away
  • Tesla Supercharger2101 North Mountain Rd, Wausau, WITesla · 8 fast ports · up to 150 kW · 17 mi away

Straight-line distance from the site, from our station database as of November 20, 2026.

Other Superchargers coming nearby

Merrill, WI Supercharger questions

When will the Merrill, WI Supercharger open?

supercharge.info publishes no opening date. Its status is planned since october 10, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.

How many stalls will the Merrill, WI Supercharger have?

4 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.

Can non-Tesla EVs charge at Merrill, WI?

supercharge.info lists it as open to other EVs.

Who owns the Merrill, WI Supercharger?

Universal EV, per the owner bracket in supercharge.info's listing. A third-party site runs on Tesla's Supercharger network.

Where can I fast charge near Merrill, WI today?

BPC (ChargePoint Network), about 0.3 mi away in a straight line.

Where this comes from

Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.

ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.