Tesla Supercharger coming to Lockbourne, OH
PlannedLockbourne, OH
The Tesla Supercharger site in Lockbourne, OH is planned (since January 28, 2026), per supercharge.info. supercharge.info lists 8 stalls at up to 500 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Planned since January 28, 2026 · source: supercharge.info
Site facts
- Status
- Planned Planned since January 28, 2026 · source: supercharge.info
- Address
- 5991 S High St, Lockbourne, OH, 43137
- Stalls
- 8 stalls
- Power
- Up to 500 kW
- Plugs
- 8 NACS (Tesla)
- Open to other EVs
- Yes
- Host
- Marathon Gas
- Hours
- 24/7
- On supercharge.info
- Lockbourne, OH
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Planned, 8 stallsSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Lockbourne, OH and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Lockbourne, OH today
- Tesla Supercharger2221 Stringtown Rd, Grove City, OHTesla · 8 fast ports · up to 150 kW · 4.2 mi away
- Byers Chevrolet5887 N Meadows Drive, Grove City, OHEV Connect · 2 fast ports · up to 120 kW · 4.5 mi away
- Obetz, OH Rechargery @ Sheetz4375 Alum Creek Dr, Obetz, OHIONNA · 8 fast ports · up to 400 kW · 4.6 mi away
- Clipper Creek3387 Civic Pl, Grove City, OHNon-Networked · 2 fast ports · up to 40 kW · 5.7 mi away
- RICART Auto Mall4255 South Hamilton Road, Groveport, OHBlink Network · 6 fast ports · up to 240 kW · 6.9 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Grove City, OH - Marlane Dr SPlanned 4210 Marlane Dr S, Grove City, OH 500 kWOpen to other EVs Planned since November 14, 2026 · supercharge.info
- Grove City, OH - London Groveport RdPlanned 2811 London Groveport Rd, Grove City, OH 12 stalls325 kW Planned since November 28, 2022 · supercharge.info
- Gahanna, OHPlanned 301 S Hamilton Rd, Gahanna, OH 325 kWOpen to other EVs Planned since May 13, 2025 · supercharge.info
- Dublin, OH - Tuttle Crossing BlvdPlanned 4975 Tuttle Crossing Blvd, Dublin, OH 500 kWOpen to other EVs Planned since October 11, 2026 · supercharge.info
Lockbourne, OH Supercharger questions
When will the Lockbourne, OH Supercharger open?
supercharge.info publishes no opening date. Its status is planned since january 28, 2026. This page will say "Opened" with the date when it opens, and you can get one email then.
How many stalls will the Lockbourne, OH Supercharger have?
8 stalls at up to 500 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Lockbourne, OH?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Lockbourne, OH today?
Tesla Supercharger (Tesla), about 4.2 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.