Tesla Supercharger coming to Dorchester, MA
Under constructionDorchester, MA
The Tesla Supercharger site in Dorchester, MA is under construction (since November 22, 2025), per supercharge.info. supercharge.info lists 8 stalls at up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Under construction since November 22, 2025 · source: supercharge.info
Site facts
- Status
- Under construction Under construction since November 22, 2025 · source: supercharge.info
- Address
- 545 Freeport St, Dorchester, MA, 02122
- Stalls
- 8 stalls
- Power
- Up to 325 kW
- Plugs
- 8 NACS (Tesla)
- Open to other EVs
- Yes
- Host
- Stop & Shop
- On supercharge.info
- Dorchester, MA
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Planned, 8 stallsSource: supercharge.info
- Planned → Permit filedSource: supercharge.info
- Permit filed → Under constructionSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Dorchester, MA and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Dorchester, MA today
- Gallivan740 Gallivan Boulevard, Dorchester, MAElectrify America · 4 fast ports · up to 350 kW · 0.5 mi away
- Local Ibew256 Freeport Street, Boston, MAChargePoint Network · 1 fast port · up to 125 kW · 0.9 mi away
- Local Ibew256 Freeport St, Boston, MAChargePoint Network · 1 fast port · up to 125 kW · 0.9 mi away
- City of Boston Municipal Lot19 Hamlet St, Boston, MAChargePoint Network · 2 fast ports · up to 125 kW · 2 mi away
- Tesla Supercharger101 Allstate Road, Boston, MATesla · 10 fast ports · up to 75 kW · 2.4 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Boston, MA - 7 Allstate RoadPlanned 7 Allstate Road, Boston, MA 500 kWOpen to other EVs Planned since June 30, 2026 · supercharge.info
- Somerville, MA - Somerville AvePlanned 180 Somerville Ave, Somerville, MA 500 kWOpen to other EVs Planned since October 9, 2026 · supercharge.info
- Boston, MA - Western AvePlanned 370 Western Ave, Brighton, MA 325 kW Planned since June 6, 2026 · supercharge.info
- Hingham, MAPlanned 11 Essington Dr, Hingham, MA Open to other EVsThird-party: Third-party owner not yet named Planned since November 12, 2026 · supercharge.info
Dorchester, MA Supercharger questions
When will the Dorchester, MA Supercharger open?
supercharge.info publishes no opening date. Its status is under construction since november 22, 2025. This page will say "Opened" with the date when it opens, and you can get one email then.
How many stalls will the Dorchester, MA Supercharger have?
8 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Dorchester, MA?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Dorchester, MA today?
Gallivan (Electrify America), about 0.5 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.