Tesla Supercharger coming to Burlingame, CA - Howard Ave
PlannedBurlingame, CA
The Tesla Supercharger site in Burlingame, CA - Howard Ave is planned (since March 10, 2024), per supercharge.info. supercharge.info lists 16 stalls at up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Planned since March 10, 2024 · source: supercharge.info
Site facts
- Status
- Planned Planned since March 10, 2024 · source: supercharge.info
- Address
- 1450 Howard Ave, Burlingame, CA, 94010
- Stalls
- 16 stalls
- Power
- Up to 325 kW
- Plugs
- 16 NACS (Tesla)
- Open to other EVs
- No, Tesla only
- Host
- Safeway
- Hours
- 5 AM–2 AM
- On supercharge.info
- Burlingame, CA - Howard Ave
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Planned, 16 stallsSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Burlingame, CA - Howard Ave and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Burlingame, CA - Howard Ave today
- Burlingame Main Library1258 Donnelly Ave, Burlingame, CAPOWERFLEX · 6 fast ports · up to 150 kW · 0.2 mi away
- Burlingame Library480 Primrose Rd, Burlingame, CAPOWERFLEX · 6 fast ports · up to 100 kW · 0.2 mi away
- Tesla Supercharger150 Anza Blvd, Burlingame, CATesla · 20 fast ports · up to 250 kW · 1 mi away
- Chula Vista Lot HPCP1133 Chula Vista Ave, Burlingame, CAeVgo Network · 8 fast ports · up to 100 kW · 1.1 mi away
- San Mateo Caltrain385 1st Ave, San Mateo, CAeVgo Network · 2 fast ports · up to 50 kW · 1.5 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Millbrae, CAUnder construction 400 El Camino Real, Millbrae, CA 24 stalls500 kWOpen to other EVs Under construction since January 7, 2026 · supercharge.info
- San Carlos, CA - Skyway RdPlanned 505 Skyway Rd, San Carlos, CA 250 kW Planned since November 7, 2024 · supercharge.info
- Brisbane, CAUnder construction 1400 Sierra Point Pkwy, Brisbane, CA 16 stalls325 kWOpen to other EVs Under construction since July 17, 2026 · supercharge.info
- Half Moon Bay, CAPlanned 225 Cabrillo Hwy S, Half Moon Bay, CA 325 kWOpen to other EVs Planned since June 11, 2026 · supercharge.info
Burlingame, CA - Howard Ave Supercharger questions
When will the Burlingame, CA - Howard Ave Supercharger open?
supercharge.info publishes no opening date. Its status is planned since march 10, 2024. This page will say "Opened" with the date when it opens, and you can get one email then.
How many stalls will the Burlingame, CA - Howard Ave Supercharger have?
16 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Burlingame, CA - Howard Ave?
supercharge.info lists it as Tesla only.
Where can I fast charge near Burlingame, CA - Howard Ave today?
Burlingame Main Library (POWERFLEX), about 0.2 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.