Tesla Supercharger coming to Bellflower, CA

Under constructionBellflower, CA

The Tesla Supercharger site in Bellflower, CA is under construction (since July 3, 2025), per supercharge.info. supercharge.info lists 16 stalls at up to 325 kW. supercharge.info publishes no opening date.

· read from supercharge.info twice a day

Under construction since July 3, 2025 · source: supercharge.info

Site facts

Status
Under construction Under construction since July 3, 2025 · source: supercharge.info
Address
17102 Clark Ave, Bellflower, CA, 90706
Stalls
16 stalls
Power
Up to 325 kW
Plugs
16 NACS (Tesla)
Open to other EVs
Yes
On supercharge.info
Bellflower, CA
First listed here
November 18, 2026

Timeline

Email me when it opens

One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.

Map: Bellflower, CA and nearby sites

  • Planned or permit filed
  • Under construction
  • Opened in the last 30 days
  • Ring: third-party owned

The site and the nearest sites in the pipeline, all listed on this page.

© OpenStreetMap · Sites: supercharge.info

Open fast chargers near Bellflower, CA today

  • G&M Oil G&M17055 Lakewood Boulevard, Bellflower, CAChargePoint Network · 1 fast port · up to 40 kW · 0.6 mi away
  • EVgo EV Charging17308 Bellflower Blvd, Bellflower, CAeVgo Network · 20 fast ports · up to 350 kW · 0.6 mi away
  • Chase Bank16804 Bellflower Blvd, Bellflower, CAeVgo Network · 4 fast ports · up to 350 kW · 0.6 mi away
  • Tesla Supercharger5929 South Street, Lakewood, CATesla · 20 fast ports · up to 250 kW · 1.7 mi away
  • WinCo Foods3400 E South St, Lakewood, CAeVgo Network · 7 fast ports · up to 350 kW · 1.7 mi away

Straight-line distance from the site, from our station database as of November 20, 2026.

Other Superchargers coming nearby

Bellflower, CA Supercharger questions

When will the Bellflower, CA Supercharger open?

supercharge.info publishes no opening date. Its status is under construction since july 3, 2025. This page will say "Opened" with the date when it opens, and you can get one email then.

How many stalls will the Bellflower, CA Supercharger have?

16 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.

Can non-Tesla EVs charge at Bellflower, CA?

supercharge.info lists it as open to other EVs.

Where can I fast charge near Bellflower, CA today?

G&M Oil G&M (ChargePoint Network), about 0.6 mi away in a straight line.

Where this comes from

Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.

ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.