Tesla Supercharger coming to Bee Cave, TX - Ranch Rd 620 S
PlannedBee Cave, TX
The Tesla Supercharger site in Bee Cave, TX - Ranch Rd 620 S is planned (since May 9, 2025), per supercharge.info. supercharge.info lists 20 stalls at up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Planned since May 9, 2025 · source: supercharge.info
Site facts
- Status
- Planned Planned since May 9, 2025 · source: supercharge.info
- Address
- 3702 Ranch Rd 620 S, Bee Cave, TX, 78738
- Stalls
- 20 stalls
- Power
- Up to 325 kW
- Plugs
- 20 NACS (Tesla)
- Open to other EVs
- Yes
- Host
- Target
- On supercharge.info
- Bee Cave, TX - Ranch Rd 620 S
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Planned, 20 stallsSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Bee Cave, TX - Ranch Rd 620 S and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Bee Cave, TX - Ranch Rd 620 S today
- Tesla Supercharger12770 Shops Parkway, Bee Cave, TXTesla · 8 fast ports · up to 250 kW · 1.1 mi away
- TXB15603 State Hwy 71, Spicewood, TXChargePoint Network · 2 fast ports · up to 125 kW · 2 mi away
- Pie AE West Lake701 S Capital of Texas Hwy, Austin, TXChargePoint Network · 4 fast ports · up to 125 kW · 7.6 mi away
- Tesla Supercharger701 South Capital of Texas Highway, West Lake Hills, TXTesla · 8 fast ports · up to 250 kW · 7.7 mi away
- Tesla Supercharger13810 Sawyer Ranch Rd, Dripping Springs, TXTesla · 8 fast ports · up to 250 kW · 8.8 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Austin, TX - Flint Rock RdPlanned 2802-2806 Flint Rock Rd, Austin, TX 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 23, 2026 · supercharge.info
- Austin, TX - W 4th StUnder construction 1205 W 4th St, Austin, TX 24 stalls500 kWOpen to other EVs Under construction since June 27, 2026 · supercharge.info
- Austin, TX - E St Elmo Rd (SC)Planned 405 E St Elmo Rd, Austin, TX 48 stalls325 kWOpen to other EVs Planned since July 27, 2026 · supercharge.info
- Austin, TX - 10107 Research BlvdPlanned 10107 Research Blvd, Austin, TX 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 23, 2026 · supercharge.info
Bee Cave, TX - Ranch Rd 620 S Supercharger questions
When will the Bee Cave, TX - Ranch Rd 620 S Supercharger open?
supercharge.info publishes no opening date. Its status is planned since may 9, 2025. This page will say "Opened" with the date when it opens, and you can get one email then.
How many stalls will the Bee Cave, TX - Ranch Rd 620 S Supercharger have?
20 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Bee Cave, TX - Ranch Rd 620 S?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Bee Cave, TX - Ranch Rd 620 S today?
Tesla Supercharger (Tesla), about 1.1 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.