Tesla Supercharger coming to Bakersfield, CA - Comanche Dr
PlannedBakersfield, CA
The Tesla Supercharger site in Bakersfield, CA - Comanche Dr is planned (since September 15, 2025), per supercharge.info. supercharge.info lists 32 stalls at up to 325 kW. supercharge.info publishes no opening date.
· read from supercharge.info twice a day
Planned since September 15, 2025 · source: supercharge.info
Site facts
- Status
- Planned Planned since September 15, 2025 · source: supercharge.info
- Address
- 1631 Comanche Dr, Bakersfield, CA, 93307
- Stalls
- 32 stalls
- Power
- Up to 325 kW
- Plugs
- 32 NACS (Tesla) · 32 CCS · 32 stalls with more than one plug type
- Open to other EVs
- Yes
- Host
- Shell / Countryside Market & Restaurants
- Hours
- 4 AM–12 AM
- Solar canopy
- Yes
- Battery storage
- Yes
- On supercharge.info
- Bakersfield, CA - Comanche Dr
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Permit filed, 32 stallsSource: supercharge.info
- Permit filed → PlannedSource: supercharge.info
Email me when it opens
One email when supercharge.info lists this site as open, with a link to its station page. Nothing else, and every email has a one-tap unsubscribe. See our privacy policy.
Map: Bakersfield, CA - Comanche Dr and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Bakersfield, CA - Comanche Dr today
- DC Corridor Bakersfield1631 Comanche Dr, Bakersfield, CAChargePoint Network · 2 fast ports · up to 40 kW · 0.1 mi away
- Tony's Pizza10701 Ca-178, Bakersfield, CANOODOE · 2 fast ports · up to 60 kW · 4.6 mi away
- Target3401 Mall View Rd, Bakersfield, CAElectrify America · 10 fast ports · up to 350 kW · 7.4 mi away
- Foodsco2505 Haley St, Bakersfield, CAeVgo Network · 8 fast ports · up to 350 kW · 8.4 mi away
- Foodsco N. Bakersfield2505 Haley St, Bakersfield, CAeVgo Network · 8 fast ports · up to 350 kW · 8.5 mi away
Straight-line distance from the site, from our station database as of November 20, 2026.
Other Superchargers coming nearby
- Bakersfield, CA - Mall View RdPlanned 3000 Mall View Rd, Bakersfield, CA 500 kWOpen to other EVs Planned since October 13, 2026 · supercharge.info
- Bakersfield, CA - Colony StPlanned 6200 Colony St, Bakersfield, CA 500 kWOpen to other EVs Planned since October 13, 2026 · supercharge.info
- Bakersfield, CA - Kelton WyPlanned 29513 Kelton Wy, Bakersfield, CA 88 stalls500 kWOpen to other EVs Planned since March 6, 2025 · supercharge.info
- Rosamond, CAPlanned 3000 Rosamond Blvd, Rosamond, CA 16 stalls500 kWOpen to other EVs Planned since February 19, 2026 · supercharge.info
Bakersfield, CA - Comanche Dr Supercharger questions
When will the Bakersfield, CA - Comanche Dr Supercharger open?
supercharge.info publishes no opening date. Its status is planned since september 15, 2025. This page will say "Opened" with the date when it opens, and you can get one email then.
How many stalls will the Bakersfield, CA - Comanche Dr Supercharger have?
32 stalls at up to 325 kW, as supercharge.info lists it on November 20, 2026.
Can non-Tesla EVs charge at Bakersfield, CA - Comanche Dr?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Bakersfield, CA - Comanche Dr today?
DC Corridor Bakersfield (ChargePoint Network), about 0.1 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.