EV Charging Stations in Bloomington, MN
Closest fast charger to the center of Bloomington: Bloomington Subaru, 500 American Boulevard West, Minneapolis, 0.5 miles away; 1 DC fast port up to 30 kW; CCS; in service per DOE AFDC as of Nov 16, 2026; last confirmed Nov 16, 2026 by DOE AFDC. 9 fast-charging locations within 5 miles are in service per DOE AFDC.
ChargingNear.me lists 128 charging ports at 30 locations in Bloomington, MN, including 29 DC fast ports (DOE AFDC and Open Charge Map data, updated Nov 16, 2026).
Best by Need
| Need | Location | Distance | Why |
|---|---|---|---|
| Fastest | Walmart 700 American Blvd E, Bloomington | 0.9 miles | up to 400 kW · 8 DC fast ports · CCS, NACS |
| Cheapest per kWh | EMC Headquarters 2890 Vicksburg Ln N, Plymouth | 14.7 miles | $0.20/kWh listed (as of Oct 13, 2026) · 1 DC fast port |
| Free | Bloomington Subaru 500 American Boulevard West, Minneapolis | 0.5 miles | Listed as free · 1 DC fast port |
| Open 24 hours | Bloomington Subaru 500 American Boulevard West, Minneapolis | 0.5 miles | Listed as open 24 hours · 1 DC fast port · up to 30 kW |
| Tesla Supercharger | Tesla Supercharger 2555 West 79th Street, Bloomington | 1.6 miles | 16 DC fast ports · up to 250 kW |
| Non-Tesla fast (CCS) | Bloomington Subaru 500 American Boulevard West, Minneapolis | 0.5 miles | Blink Network · 1 DC fast port · up to 30 kW |
Source: DOE AFDC and Open Charge Map data, updated Nov 16, 2026.
Charging at a Glance
| Charging locations | 30 |
| Ports | 128 |
| DC fast ports | 29 |
| Level 2 ports | 99 |
| Networks | 5 |
| Open 24 hours | 25 locations |
Source: DOE AFDC and Open Charge Map data, updated Nov 16, 2026.
Charging Networks in Bloomington
- Blink Network: 11 charging locations
- ChargePoint: 9 charging locations
- Tesla Destination: 5 charging locations
- Tesla: 1 charging location
- Walmart: 1 charging location
Connector Types in Bloomington
| Connector | Locations |
|---|---|
| J1772 | 20 |
| NACS | 9 |
| CCS | 4 |
All 30 Charging Locations in Bloomington
Each location is one address; every port there is listed on its page.
Browse by ZIP code
- ZIP 55420 4 locations · 16 ports
- ZIP 55425 10 locations · 45 ports
- ZIP 55431 7 locations · 35 ports
- ZIP 55437 6 locations · 20 ports
- AC Hotel by Marriott Bloomington Mall of America 8100 26th Ave S · 4 Level 2 · NACS · 16 kW max · Tesla Destination · open 24 hours · free · opened Jan 2018 · confirmed Aug 27, 2026
- Blooming Meadow Blooming 1910 E 86th St · 2 Level 2 · J1772 · 12 kW max · ChargePoint · open 24 hours · opened Jun 2023 · confirmed Nov 16, 2026
- Bloomington Acura 7801 Lyndale Avenue South · 1 DC fast, 3 Level 2 · J1772, CCS · 30 kW max · Blink · open 24 hours · opened Sep 2023 · confirmed Nov 16, 2026
- Bloomington Big 3600 W 98th Street · 2 Level 2 · J1772, NACS · 10 kW max · ChargePoint · open 24 hours · opened Jun 2026 · confirmed Nov 15, 2026
- Bloomington Civic Plaza 1800 W Old Shakopee Rd · 4 Level 2 · J1772, NACS · 10 kW max · ChargePoint · open 24 hours · opened May 2026 · confirmed Nov 15, 2026
Directions: parking Lot North - Bloomington Parking Ramp 8051 26th Avenue South · 8 Level 2 · J1772 · 10 kW max · Blink · opened Jun 2026 · confirmed Nov 16, 2026
- ChargePoint EV Charging Southdale Liquor · 2 Level 2 · J1772 · 4 kW max · ChargePoint · confirmed Nov 11, 2025
- Fairfield Inn & Suites Minneapolis Mall of America 2401 American Blvd E · 6 Level 2 · NACS · 16 kW max · Tesla Destination · open 24 hours · free · opened Sep 2018 · confirmed Aug 27, 2026
- Freeway Ford 9700 Lyndale Avenue South · 2 DC fast · CCS · 180 kW max · Blink · open 24 hours · opened Sep 2025 · confirmed Nov 16, 2026
- Genesee Apartments and Townhomes 8055 Penn Avenue South · 1 Level 2 · J1772 · 13 kW max · Blink · open 24 hours · opened Apr 2025 · confirmed Nov 16, 2026
- Goodwill 6023 Nicollet Ave · 2 Level 2 · J1772 · 4 kW max · confirmed Feb 20, 2024
- Hampton Inn Minneapolis Bloomington West 5400 American Blvd W · 4 Level 2 · NACS · 16 kW max · Tesla Destination · open 24 hours · free · opened Jun 2019 · confirmed Aug 27, 2026
- Ikea USA Bloomington 8000 Ikea Way · 2 Level 2 · J1772 · 7 kW max · ChargePoint · open 24 hours · opened Feb 2023 · confirmed Nov 16, 2026
Directions: Near entrance in underground parking - Indigo Pub Indigo @ BCS 8001 33rd Ave S · 2 Level 2 · J1772 · 7 kW max · ChargePoint · open 24 hours · opened Jul 2017 · confirmed Nov 16, 2026
- Luther Infiniti of Bloomington 1500 West 81st Street · 2 DC fast, 4 Level 2 · CCS, J1772 · 120 kW max · Blink · open 24 hours · opened Sep 2024 · confirmed Nov 16, 2026
- Mall of America MOA East 60 East Broadway East · 6 Level 2 · J1772 · 12 kW max · ChargePoint · open 24 hours · opened Nov 2024 · confirmed Nov 16, 2026
- Mall of America MOA West 60 East Broadway West · 8 Level 2 · J1772 · 12 kW max · ChargePoint · open 24 hours · opened Nov 2024 · confirmed Nov 16, 2026
- Motorwerks BMW 1300 American Blvd W · 2 Level 2 · J1772 · 4 kW max · confirmed Jun 26, 2020
- My Credit Union Lyndale Ave 9550 Lyndale Ave S · 2 Level 2 · J1772 · 7 kW max · ChargePoint · opened Jun 2021 · confirmed Nov 16, 2026
Directions: Near North Entrance - Norman Pointe 5601 Green Valley Drive · 2 Level 2 · J1772 · 4 kW max · Blink · open 24 hours · opened Nov 2016 · confirmed Nov 16, 2026
- Southtown Office Park 8120 Penn Ave S · 4 Level 2 · J1772 · 6 kW max · Blink · open 24 hours · opened Apr 2022 · confirmed Nov 16, 2026
- Staybridge Suites Minneapolis-Bloomington, an IHG Hotel 5150 American Blvd W · 6 Level 2 · J1772, NACS · 10 kW max · Tesla Destination · open 24 hours · free · opened Jul 2023 · confirmed Aug 27, 2026
- Tesla Supercharger 2555 West 79th Street · 16 DC fast · NACS · 250 kW max · Tesla · open 24 hours · opened Sep 2022 · confirmed Jun 18, 2026
- The Parking SPT MSP 3750 American Boulevard East · 4 Level 2 · J1772 · 7 kW max · ChargePoint · open 24 hours · opened Jan 2026 · confirmed Nov 15, 2026
Directions: Right hand side as you enter the south entrance - Tower 8400 Normandale Lake Drive · 8 Level 2 · J1772 · 7 kW max · Blink · open 24 hours · opened Sep 2022 · confirmed Nov 16, 2026
- Tower 8500 Normandale Lake Boulevard · 4 Level 2 · J1772 · 7 kW max · Blink · open 24 hours · opened Sep 2022 · confirmed Nov 16, 2026
- Tower 8300 Norman Center Drive · 2 Level 2 · J1772 · 6 kW max · Blink · open 24 hours · opened Sep 2021 · confirmed Nov 16, 2026
- Tower 8331 Norman Center Drive · 2 Level 2 · J1772 · 6 kW max · Blink · open 24 hours · opened Jun 2022 · confirmed Nov 16, 2026
- TownePlace Suites Minneapolis Mall of America 2500 Lindau Ln · 3 Level 2 · NACS · 16 kW max · Tesla Destination · open 24 hours · free · opened Dec 2017 · confirmed Aug 27, 2026
- Walmart 700 American Blvd E · 8 DC fast · CCS, NACS · 400 kW max · Walmart · open 24 hours · opened Jul 2026 · confirmed Sep 14, 2026
Other map listings
No plugs or ports are on file for these listings, so they are not counted in this page's totals.
- EV Charging Station 7744 Penn Ave S
- Tesla EV Charging 3510 Galleria · Tesla
See the cheapest EV charging in Bloomington ranked by $/kWh →
Former and Unavailable Chargers in Bloomington
Stations in Bloomington that the DOE AFDC list no longer includes, marks unavailable, or that are confirmed closed. Each page keeps the station's facts and lists the nearest live chargers.
- BLOOMINGTON CIVIC PLAZA · 1800 Old Shakopee Rd · Removed from the DOE AFDC list on Oct 30, 2026
- Element by Westin Mall of America - Tesla Destination · 2400 E 82nd St · Removed from the DOE AFDC list on Oct 30, 2026
Charging History and Highway Access in Bloomington
The first charger in Bloomington that DOE AFDC dates opened in Nov 2016 at Norman Pointe. 5 locations opened in the last 12 months, most recently Walmart (Jul 2026). By DOE AFDC's per-port power in Bloomington, CCS reaches 400 kW at Walmart, NACS tops out at 400 kW at Walmart and J1772 tops out at 17 kW at Luther Infiniti of Bloomington. Bloomington ranks #4 of 216 Minnesota cities by charging locations on ChargingNear.me, with 3% of the state's 974.
The nearest DC fast site, Bloomington Subaru (0.5 miles from the center), is 0.6 miles from I-35W, an FHWA EV corridor (corridor-ready), and fails the NEVI check (1 CCS port (needs 4)). Source: ChargingNear.me NEVI-grade file (DOE AFDC, FHWA corridors) data, updated Nov 16, 2026.
Closest Level 2 Charging Outside Bloomington
- Hennepin County Augsburg Park 7100 Nicollet Ave, Minneapolis · 1.3 miles · 2 Level 2 ports · ChargePoint
- Wood Lake NC 6710 Lake Shore Drive South, Richfield · 1.9 miles · 6 Level 2 ports · ChargePoint
- The Durham Apartments station location 7201 York Ave. S, Edina · 2.2 miles · 1 Level 2 port · Blink Network
- Ramp France Ave 4000 Minnesota Dr, Edina · 2.5 miles · 2 Level 2 ports · ChargePoint
- City of Edina Lot 4401 West 76th Street, Edina · 2.6 miles · 6 Level 2 ports · ChargePoint
Nearest Fast Chargers to Bloomington, MN
- Bloomington Subaru 500 American Boulevard West · Minneapolis, MN · Blink · 1 DC fast port · up to 30 kW · 0.5 mi · Working-Now Score 80
- Bloomington Acura 7801 Lyndale Avenue South · Bloomington, MN · Blink · 1 DC fast port · up to 30 kW · 0.5 mi · Working-Now Score 80
- Luther Infiniti of Bloomington 1500 West 81st Street · Bloomington, MN · Blink · 2 DC fast ports · up to 120 kW · 0.9 mi · Working-Now Score 80
- Walmart 700 American Blvd E · Bloomington, MN · Walmart · 8 DC fast ports · up to 400 kW · 0.9 mi · Working-Now Score 75
- Tesla Supercharger 2555 West 79th Street · Bloomington, MN · Tesla · 16 DC fast ports · up to 250 kW · 1.5 mi · Working-Now Score 70
Working-Now Score (0–100) comes from each station's listed status, recent confirmations and driver check-ins. How the score works.
Road-Trip Routes Near Bloomington, MN
- Minneapolis, MN to Chicago, IL passes 8.2 mi away
- Minneapolis, MN to Madison, WI passes 8.2 mi away
Straight-line distances, counts and Working-Now Scores: ChargingNear.me, from DOE AFDC and Open Charge Map data, updated Nov 16, 2026.
Questions About EV Charging in Bloomington
How many EV charging stations are in Bloomington, MN?
Bloomington, MN has 30 charging locations with 128 ports: 29 DC fast ports and 99 Level 2 ports. 5 locations have DC fast charging. 27 locations are listed as open to the public. The most common networks in Bloomington are Blink Network (11), ChargePoint (9), Tesla Destination (5) and Tesla (1). 3 locations have no network and run on the host's own terms.
Where can I find DC fast charging in Bloomington?
Bloomington has 29 DC fast ports at 5 locations. The largest is Tesla Supercharger at 2555 West 79th Street, with 16 DC fast ports, up to 250 kW, Tesla. Next is Walmart at 700 American Blvd E, with 8 DC fast ports, up to 400 kW, Walmart. Then Bloomington Acura at 7801 Lyndale Avenue South, 0.5 miles away.
Are there Tesla Superchargers in Bloomington?
Yes. 1 location in Bloomington, MN is a Tesla Supercharger. 5 locations have Tesla Destination (Level 2) chargers as well. Of the 5 DC fast locations in Bloomington, 4 are on networks other than Tesla. DC fast chargers list CCS, the fast plug most non-Tesla EVs use, at 4 DC fast locations and NACS (Tesla) at 2 DC fast locations. Tesla decides which Superchargers accept other brands; the Tesla app shows it per site.
How much does EV charging cost in Bloomington?
DOE AFDC lists no per-kWh price for the chargers in Bloomington, MN. 5 locations list free charging. 25 locations in Bloomington list no per-kWh price, so check the Blink Network app or the charger's screen before you start. The first charger in Bloomington that DOE AFDC dates opened in Nov 2016 at Norman Pointe. 5 locations opened in the last 12 months, most recently Walmart (Jul 2026).
Where else can I charge near Bloomington?
Nearby places with chargers include Richfield, MN (1 location), Edina, MN (19 locations), Eagan, MN (19 locations) and Burnsville, MN (10 locations). The closest Level 2 location outside Bloomington is Hennepin County Augsburg Park at 7100 Nicollet Ave in Minneapolis, 1.3 miles from the center, with 2 ports. The closest fast site outside Bloomington is Bloomington Subaru in Minneapolis, 0.5 miles from the center. Next is Wood Lake NC in Richfield, 1.9 miles away.
What plugs do EV chargers in Bloomington have?
In Bloomington, MN, 20 locations have J1772, 9 locations have NACS and 4 locations have CCS. By DOE AFDC's per-port power in Bloomington, CCS reaches 400 kW at Walmart, NACS tops out at 400 kW at Walmart and J1772 tops out at 17 kW at Luther Infiniti of Bloomington.
See Something Wrong?
If station information is outdated or incorrect, view the station on our map and submit a correction. Your reports help keep our data accurate for all EV drivers.
Own a Property in Bloomington?
Add EV charging to your parking lot and earn revenue from EV drivers. Learn about installing chargers.