Mission, TX Tesla Supercharger
OpenMission, TX
The Tesla Supercharger in Mission, TX opened on November 5, 2026, per supercharge.info. supercharge.info lists 8 stalls at up to 325 kW.
· read from supercharge.info twice a day
Opened November 5, 2026 · source: supercharge.info
Site facts
- Status
- Open Opened November 5, 2026 · source: supercharge.info
- Address
- 2427 E Expressway 83, Mission, TX, 78572
- Stalls
- 8 stalls
- Power
- Up to 325 kW
- Plugs
- 8 NACS (Tesla) · 8 CCS · 8 stalls with more than one plug type
- Open to other EVs
- Yes
- Host
- Target
- Opened
- November 5, 2026
- Station page
- Live status and directions
- On supercharge.info
- Mission, TX
- First listed here
- November 18, 2026
Timeline
- Added to supercharge.info as Planned, 8 stallsSource: supercharge.info
- Planned → Under constructionSource: supercharge.info
- Under construction → OpenSource: supercharge.info
Map: Mission, TX and nearby sites
- Planned or permit filed
- Under construction
- Opened in the last 30 days
- Ring: third-party owned
The site and the nearest sites in the pipeline, all listed on this page.
Open fast chargers near Mission, TX today
- Target2427 E Expressway 83, Mission, TXTesla · 8 fast ports · up to 325 kW · 0.1 mi away
- South Texas Buick GMC4220 W Expressway 83, Mcallen, TXEV Connect · 3 fast ports · up to 120 kW · 0.8 mi away
- Embassy Suites by Hilton McAllen Convention Center800 Convention Center Blvd., Mcallen, TXTesla · 8 fast ports · up to 150 kW · 1.5 mi away
- Spike's Motor Company805 E Expressway 83, Mission, TXFORD_CHARGE · 4 fast ports · up to 240 kW · 2.2 mi away
- Sames Ford McAllen1400 E Expressway 83, Mcallen, TXEV Connect · 4 fast ports · up to 180 kW · 4.9 mi away
Straight-line distance from the site, from our station database as of November 21, 2026.
Other Superchargers coming nearby
- Laredo, TX - Jacaman RdPlanned 2412 Jacaman Rd, Laredo, TX 325 kWOpen to other EVsThird-party: Third-party owner not yet named Planned since September 23, 2026 · supercharge.info
- Laredo, TX - San Dario AveUnder construction 6627 San Dario Ave, Laredo, TX 12 stalls325 kWOpen to other EVs Under construction since August 4, 2026 · supercharge.info
Mission, TX Supercharger questions
When did the Mission, TX Supercharger open?
On November 5, 2026, per supercharge.info. See its station page for live status.
How many stalls will the Mission, TX Supercharger have?
8 stalls at up to 325 kW, as supercharge.info lists it on November 21, 2026.
Can non-Tesla EVs charge at Mission, TX?
supercharge.info lists it as open to other EVs.
Where can I fast charge near Mission, TX today?
Target (Tesla), about 0.1 mi away in a straight line.
Where this comes from
Site data from supercharge.info, the volunteer-run Supercharger map, read twice a day. Each status shows the day it started and its source. A site in the pipeline shows no opening date, because the source does not publish one. NEVI funding is shown only where a NEVI-funded station or a state NEVI award with coordinates is within 150 m on the same network.
ChargingNear.me is independent and is not affiliated with Tesla or supercharge.info. See something wrong? Send a correction.