Miller Electric — 6805 Southpoint Pkwy, Jacksonville, FL 32216
Yes. 6805 Southpoint Pkwy has 2 DC fast and 12 Level 2 public chargers on AmpUp, up to 4 kW, with J1772, CCS and NACS plugs. Open 24/7, $0.24/kWh. Verified Oct 21, 2026.
14 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 2 Level 2 | J1772 | 4 kW | AmpUp | $0.24/kWh | Open · Verified Oct 13, 2026 | U.S. DOE (NREL) | Public — Public - Credit card at all times |
| Miller Electric HQ | 8 Level 2 | J1772 | 4 kW | AmpUp | Not listed | Open · Verified Oct 13, 2026 | U.S. DOE (NREL) | Public |
| Miller Electric Company | 2 DC fast | CCS | Not listed | EVgo | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
| Miller Electric Company | 2 Level 2 | J1772, NACS | 4 kW | Tesla Destination | Not listed | Open · Verified Nov 11, 2025 | U.S. DOE (NREL) | Public |
Location Facts
- Network
- AmpUp (also EVgo, Tesla Destination)
- Pricing
- $0.24 per kWh
- Hours
- Contact station for hours of availability
Contact site for information
24 hours daily - Access
- Public — Public - Credit card at all times
- Max power
- 4 kW
- Nearest other DC fast
- Experience Center — 0.1 mi, up to 50 kW
- Last verified
Nearest Charging Locations
- Experience Center 6811 Southpoint Parkway · Blink · 17 ports · up to 50 kW · 0.1 mi
- The Crossing at Enterprise Park 4345 Southpoint Blvd · ChargeUP · 2 ports · up to 4 kW · 0.5 mi
- Hampton Inn Jacksonville at JTB 4681 Lenoir Ave E · Tesla Destination · 4 ports · up to 4 kW · 0.8 mi
- Fairfield Inn & Suites Jacksonville Butler Boulevard 4888 Lenoir Ave · Tesla Destination · 4 ports · up to 8 kW · 0.9 mi
- Waffle House Jacksonville 5067 J Turner Butler Blvd · Blink · 4 ports · up to 50 kW · 1.1 mi
- Century Deerwood Park 8450 Gate Pkwy W · Loop · 6 ports · up to 4 kW · 1.5 mi
- Tesla Supercharger 5735 Philips Highway · Tesla · 12 ports · up to 250 kW · 1.6 mi
- Presidium Town Center 7738 A C Skinner Pkwy · AmpUp · 5 ports · up to 4 kW · 1.6 mi
- The Loree 8649 A C Skinner Parkway · Blink · 2 ports · 2.0 mi
- Memorial Hospital 3625 University Blvd S · ChargeUP · 4 ports · up to 4 kW · 2.1 mi
Frequently Asked Questions
How many chargers are at Miller Electric on 6805 Southpoint Pkwy?
Miller Electric has 14 charging ports: 2 DC fast, 12 Level 2, on the AmpUp network.
Which plugs does Miller Electric in Jacksonville have?
J1772, CCS, NACS, with up to 4 kW.
Is there DC fast charging at 6805 Southpoint Pkwy, Jacksonville, FL 32216?
Yes: 2 DC fast ports, up to 4 kW.
How much does charging cost at Miller Electric, Jacksonville?
$0.24 per kWh (as listed Oct 21, 2026).
When is Miller Electric in Jacksonville open?
Contact station for hours of availability.
Can anyone charge at Miller Electric in Jacksonville?
Yes, the chargers are listed as open to the public.