CSG EV Sdsu SCP — 5850 Lindo Paseo, San Diego, CA 92115
Yes. 5850 Lindo Paseo has 2 DC fast and 4 Level 2 public chargers on ChargePoint, up to 4 kW, with CHAdeMO, CCS and J1772 plugs. Open 24/7. Verified Oct 21, 2026.
6 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 1 DC fast | CHAdeMO, CCS | 4 kW | ChargePoint | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
| Charger 2 | 1 DC fast | CHAdeMO, CCS | 4 kW | ChargePoint | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
| SDSU South Campus Plaza | 4 Level 2 | J1772 | 4 kW | DirtRoad | Not listed | Open · Verified Sep 26, 2026 | U.S. DOE (NREL) | Public |
Location Facts
- Network
- ChargePoint (also DirtRoad)
- Hours
- 24 hours daily
- Access
- Public
- Max power
- 4 kW
- Nearest other DC fast
- SDSU Lot — 0.1 mi, up to 4 kW
- Last verified
Nearest Charging Locations
- SDSU Lot Zura Wy · DirtRoad · 1 port · up to 4 kW · 0.1 mi
- CSG EV Sdsu Lot 5150 East Campus Dr · ChargePoint · 6 ports · up to 4 kW · 0.2 mi
- CSG EV Sdsu Lot 5 East Campus Dr · ChargePoint · 2 ports · up to 4 kW · 0.2 mi
- CSG EV Sdsu Lot 5 East Campus Dr · ChargePoint · 2 ports · up to 4 kW · 0.2 mi
- Sdsu SSE 6065 Aztec Circle · DirtRoad · 2 ports · 0.2 mi
- CSG EV Sdsu SSE ADA 6065 Aztec Circle Dr · ChargePoint · 2 ports · up to 4 kW · 0.2 mi
- SDSU Lot East Campus Dr · DirtRoad · 14 ports · up to 4 kW · 0.2 mi
- CSG EV Sdsu Lot 6150 Zura Wy · ChargePoint · 8 ports · up to 4 kW · 0.3 mi
- CSG EV Sdsu ARC ADA PK 5301 55th St · ChargePoint · 4 ports · up to 4 kW · 0.3 mi
- CSG EV Sdsu Lower 5600 Canyon Crest Dr · ChargePoint · 4 ports · up to 4 kW · 0.3 mi
More ChargePoint Locations Nearby
- CSG EV Sdsu Lot 5373-5399 College Ave · ChargePoint · 2 ports · up to 4 kW · 0.4 mi
- CSG EV Sdsu Lot 5300 Aztec Walk · ChargePoint · 2 ports · up to 4 kW · 0.4 mi
- CSG EV Sdsu Lot 5300 Aztec Walk · ChargePoint · 2 ports · up to 4 kW · 0.4 mi
- CSG EV Sdsu Lot 5200 55th St · ChargePoint · 2 ports · up to 4 kW · 0.4 mi
- CSG EV Sdsu Parking 5625 Aztec Circle Dr · ChargePoint · 2 ports · up to 4 kW · 0.5 mi
- Nrtoyota Toyota SD 5910 Mission Gorge Rd · ChargePoint · 1 port · up to 50 kW · 1.9 mi
Frequently Asked Questions
How many chargers are at CSG EV Sdsu SCP on 5850 Lindo Paseo?
CSG EV Sdsu SCP has 6 charging ports: 2 DC fast, 4 Level 2, on the ChargePoint network.
Which plugs does CSG EV Sdsu SCP in San Diego have?
CHAdeMO, CCS, J1772, with up to 4 kW.
Is there DC fast charging at 5850 Lindo Paseo, San Diego, CA 92115?
Yes: 2 DC fast ports, up to 4 kW.
When is CSG EV Sdsu SCP in San Diego open?
24 hours daily.
Can anyone charge at CSG EV Sdsu SCP in San Diego?
Yes, the chargers are listed as open to the public.