EV Charging at I-25 Exit 197 near Centennial, CO
10 charging locations are within 1 mile of I-25 Exit 197 near Centennial, CO and closest to that exit, 3 with DC fast charging. Closest fast charger: Target, 6767 S. Clinton St., Englewood, 0.1 miles from the exit; 3 DC fast ports up to 350 kW; J1772 and CCS.
Charging at I-25 Exit 197
| Location | Distance | Charging | Network | Hours and pricing as listed | Last confirmed |
|---|---|---|---|---|---|
| Target 6767 S. Clinton St., Englewood, CO | 0.1 miles SE | 3 DC fast ports up to 350 kW J1772, CCS | Electrify America | 24 hours daily | Nov 22, 2026 |
| La Quinta Inn & Suites Englewood Tech Center 9009 E Arapahoe Rd, Greenwood Village, CO | 0.1 miles N | 4 Level 2 ports up to 11 kW J1772 | EnviroSpark | 24 hours daily; for guest use only · $0.40 per kWh | Nov 13, 2025 |
| Tesla Supercharger 6880 S Clinton St, Greenwood Village, CO | 0.4 miles SE | 12 DC fast ports up to 325 kW NACS | Tesla | 24 hours daily. NACS partner enabled. | Jun 18, 2026 |
| The Outlook at Arapahoe 6455 South Yosemite Street, Greenwood Village, CO | 0.4 miles N | 4 Level 2 ports up to 10 kW J1772 | Blink Network | Mon: 6:00am-6:00pm; Tue: 6:00am-6:00pm; Wed: 6:00am-6:00pm; Thu: 6:00am-6:00pm; Fri: 6:… | Nov 22, 2026 |
| Greenwood Plaza 6560 Greenwood Plaza Boulevard, Englewood, CO | 0.6 miles W | 2 Level 2 ports up to 12 kW J1772 | Blink Network | 24 hours daily · $1.00-$5.00/Hr Variable Parking Fee | Nov 22, 2026 |
| Larry H Miller Nissan 10030 E Arapahoe Rd | 0.7 miles E | 1 DC fast port up to 50 kW CHAdeMO, J1772, CCS | Not on a network | Dealership business hours · Free | Jan 13, 2026 |
| Greenwood GV Visitor Lot 10001 E Costilla Ave, Greenwood Village, CO | 0.7 miles E | 2 Level 2 ports up to 7 kW J1772 | ChargePoint | 24 hours daily | Nov 22, 2026 |
| Griffis 7700 E Peakview Ave | 0.8 miles W | 2 Level 2 ports up to 7 kW J1772 | ChargePoint | 24 hours daily | Nov 22, 2026 |
| KEW Realty 6855 S Havana St, Englewood, CO | 0.9 miles E | 2 Level 2 ports up to 7 kW J1772 | ChargePoint | 24 hours daily | Nov 22, 2026 |
| EchoPark Automotive 10401 E Arapahoe Rd | 0.9 miles E | 1 Level 2 port up to 4 kW J1772 | Not on a network | Dealership business hours; dealership use only | Nov 6, 2024 |
| Terrapin 10909 E Arapahoe Pl | 1.3 miles E | 5 DC fast ports up to 320 kW CCS, NACS | Autel | 24 hours daily | — |
| Netreit Arapaho 6446 S Kenton St | 1.4 miles E | 2 Level 2 ports up to 7 kW J1772 | ChargePoint | 24 hours daily | Nov 22, 2026 |
| Walmart 5650 S Chambers Rd, Aurora, CO | 4.0 miles E | 4 DC fast ports up to 350 kW CCS | Electrify America | 24 hours daily | Nov 22, 2026 |
3 more charging locations within 1 mile of this exit are closer to Exit 196 and Exit 198 and listed there.
Source: DOE AFDC and Open Charge Map data, updated Nov 22, 2026.
Next Fast Chargers on I-25
- Southbound, the next fast charger past Exit 197 is Rivian Adventure EV Charging at Exit 195 in Englewood, 1.9 highway miles on, with 12 DC fast ports up to 300 kW.
- Northbound, the next fast charger past Exit 197 is Denver Tech Center at Exit 198 in Greenwood Village, 1.3 highway miles on, with 4 DC fast ports up to 325 kW.
Frequently Asked Questions
Where can I charge an EV at I-25 Exit 197?
10 charging locations within 1 mile of I-25 Exit 197 are closest to that exit: Target (6767 S. Clinton St., Englewood, 0.1 miles), La Quinta Inn & Suites Englewood Tech Center (9009 E Arapahoe Rd, Greenwood Village, 0.1 miles) and Tesla Supercharger (6880 S Clinton St, Greenwood Village, 0.4 miles), and 7 more. 3 more locations within 1 mile are closer to Exit 196 and Exit 198. Distances are straight-line from the exit ramps.
Is there DC fast charging at I-25 Exit 197?
Yes: 3 of the 10 charging locations within 1 mile of I-25 Exit 197 and closest to it have DC fast charging, 1 on Tesla's Supercharger network and 2 on other networks. The closest is Target, 6767 S. Clinton St., Englewood, 0.1 miles from the exit, with 3 DC fast ports up to 350 kW (J1772 and CCS) on Electrify America.
Where is the next fast charger after I-25 Exit 197?
Southbound, the next fast charger past Exit 197 is Rivian Adventure EV Charging at Exit 195 in Englewood, 1.9 highway miles on, with 12 DC fast ports up to 300 kW. Northbound, the next fast charger past Exit 197 is Denver Tech Center at Exit 198 in Greenwood Village, 1.3 highway miles on, with 4 DC fast ports up to 325 kW.
Which charging networks are at I-25 Exit 197?
Of the 13 locations within 5 miles that have I-25 Exit 197 as their closest exit, 4 are on ChargePoint, 2 on Blink Network, 2 on Electrify America and 2 not on a network, and 3 on other networks. Each location's network decides how you start and pay for a charge. The table lists each location's network, plugs, hours and pricing as DOE AFDC lists them.
Is there 24-hour EV charging at I-25 Exit 197?
10 of the 13 locations within 5 miles that have I-25 Exit 197 as their closest exit list 24-hour access: Target (6767 S. Clinton St., Englewood, 0.1 miles), La Quinta Inn & Suites Englewood Tech Center (9009 E Arapahoe Rd, Greenwood Village, 0.1 miles) and Tesla Supercharger (6880 S Clinton St, Greenwood Village, 0.4 miles), and 7 more. Hours are as each location lists them with DOE AFDC.
ChargingNear.me lists 10 charging locations within 1 mile of I-25 Exit 197 near Centennial, CO that have it as their closest I-25 exit (DOE AFDC and Open Charge Map data, updated Nov 22, 2026).