Campus EV North — 7819 Folsom Blvd, Sacramento, CA 95826

Yes. 7819 Folsom Blvd has 2 Level 2 public chargers on ChargePoint, up to 4 kW, with J1772 plug. Open 24/7. Verified Oct 19, 2026.

2 Charging Ports at This Location

ChargerPortsPlugsMax powerNetworkPriceStatusSourceAccess
Charger 12 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 19, 2026U.S. DOE (NREL)Public

Location Facts

Network
ChargePoint
Hours
24 hours daily
Access
Public
Max power
4 kW
Nearest DC fast alternative
Target — 0.8 mi, up to 350 kW
Last verified

Nearest Charging Locations

  • Campus EV South 7919 Folsom Blvd · ChargePoint · 2 ports · up to 4 kW · under 0.1 mi
  • Csus EV ARC 7667 Folsom Blvd · ChargePoint · 2 ports · 0.1 mi
  • The Phoenix SAC 200 Bicentennial Cir · ChargePoint · 2 ports · up to 4 kW · 0.3 mi
  • Phoenix Apartments 100 Bicentennial Cir. · EV Connect · 4 ports · up to 4 kW · 0.4 mi
  • Csus atlas cedar way · ChargePoint · 2 ports · up to 4 kW · 0.7 mi
  • SCUSD Central Kitchen 3101 Redding Ave · OpConnect · 6 ports · up to 4 kW · 0.7 mi
  • Csus Atlas Cedar Way · ChargePoint · 3 ports · up to 4 kW · 0.7 mi
  • Twelve55 1255 University Ave · Loop · 13 ports · up to 4 kW · 0.7 mi
  • Autel 1865 65th St · Autel · 3 ports · up to 4 kW · 0.8 mi
  • Wexler 1500 67th St · Loop · 15 ports · up to 4 kW · 0.8 mi

More ChargePoint Locations Nearby

Frequently Asked Questions

How many chargers are at Campus EV North on 7819 Folsom Blvd?

Campus EV North has 2 charging ports: 2 Level 2, on the ChargePoint network.

Which plugs does Campus EV North in Sacramento have?

J1772, with up to 4 kW.

Is there DC fast charging at 7819 Folsom Blvd, Sacramento, CA 95826?

No. Campus EV North has Level 2 charging only (2 ports). The nearest DC fast charging is Target, 0.8 mi away.

When is Campus EV North in Sacramento open?

24 hours daily.

Can anyone charge at Campus EV North in Sacramento?

Yes, the chargers are listed as open to the public.

Related Pages