Aztec EV Aztec Chevrolet — 772 U.S. 181, Beeville, TX 78102

Yes. 772 U.S. 181 has 1 DC fast public charger on ChargePoint, up to 50 kW, with CHAdeMO and CCS plugs. Open 24/7. Verified Oct 21, 2026.

1 Charging Port at This Location

ChargerPortsPlugsMax powerNetworkPriceStatusSourceAccess
Charger 11 DC fastCHAdeMO, CCS50 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public

Location Facts

Network
ChargePoint
Hours
24 hours daily
Access
Public
Max power
50 kW
Nearest other DC fast
Flying J — 18.5 mi, up to 50 kW
Last verified

Nearest Charging Locations

More ChargePoint Locations Nearby

  • Love's 2645 Interstate 37 · ChargePoint · 4 ports · up to 150 kW · 28.0 mi
  • Ccia 1000 International Drive · ChargePoint · 10 ports · up to 4 kW · 47.2 mi
  • Corpus 501 S. Shoreline Blvd · ChargePoint · 4 ports · up to 4 kW · 48.8 mi
  • Edhicksimports 3102 S Padre Island Dr · ChargePoint · 3 ports · up to 50 kW · 52.0 mi
  • City of Cuero EN RR 121 EN Railroad · ChargePoint · 2 ports · up to 4 kW · 53.2 mi
  • Chshm TR Museum CTH Museum 302 N Esplanade St · ChargePoint · 2 ports · up to 4 kW · 53.4 mi

Frequently Asked Questions

How many chargers are at Aztec EV Aztec Chevrolet on 772 U.S. 181?

Aztec EV Aztec Chevrolet has 1 charging port: 1 DC fast, on the ChargePoint network.

Which plugs does Aztec EV Aztec Chevrolet in Beeville have?

CHAdeMO, CCS, with up to 50 kW.

Is there DC fast charging at 772 U.S. 181, Beeville, TX 78102?

Yes: 1 DC fast port, up to 50 kW.

When is Aztec EV Aztec Chevrolet in Beeville open?

24 hours daily.

Can anyone charge at Aztec EV Aztec Chevrolet in Beeville?

Yes, the chargers are listed as open to the public.

Related Pages