Fred Beans Buick GMC of Mechanicsburg — 6251 Carlisle Pike, Mechanicsburg, PA 17050

Yes. 6251 Carlisle Pike has 1 DC fast public charger on EV Connect, up to 50 kW, with CCS plug. Open 24/7. Verified Oct 20, 2026.

1 Charging Port at This Location

ChargerPortsPlugsMax powerNetworkPriceStatusSourceAccess
Charger 11 DC fastCCS50 kWEV ConnectNot listedOpen · Verified Oct 20, 2026U.S. DOE (NREL)Public

Location Facts

Network
EV Connect
Hours
24 hours daily
Access
Public
Max power
50 kW
Nearest other DC fast
Doylestown Out Facing HY — 0.1 mi, up to 50 kW
Last verified

Nearest Charging Locations

More EV Connect Locations Nearby

  • Admin Building 1998 West Harrisburg Pike · EV Connect · 8 ports · up to 50 kW · 12.6 mi
  • Harsh 115 Museum Drive · EV Connect · 4 ports · up to 4 kW · 16.5 mi
  • Powder Mill 42 Oak Ridge Dr · EV Connect · 4 ports · up to 4 kW · 27.3 mi
  • Whitmoyer Chevrolet Mount Joy 1001 E Main St · EV Connect · 1 port · 29.0 mi
  • H&H Chevrolet Cadillac 730 E King St · EV Connect · 1 port · up to 50 kW · 29.9 mi
  • ALT Building 280 Touring Blvd · EV Connect · 3 ports · up to 4 kW · 36.3 mi

Frequently Asked Questions

How many chargers are at Fred Beans Buick GMC of Mechanicsburg on 6251 Carlisle Pike?

Fred Beans Buick GMC of Mechanicsburg has 1 charging port: 1 DC fast, on the EV Connect network.

Which plugs does Fred Beans Buick GMC of Mechanicsburg in Mechanicsburg have?

CCS, with up to 50 kW.

Is there DC fast charging at 6251 Carlisle Pike, Mechanicsburg, PA 17050?

Yes: 1 DC fast port, up to 50 kW.

When is Fred Beans Buick GMC of Mechanicsburg in Mechanicsburg open?

24 hours daily.

Can anyone charge at Fred Beans Buick GMC of Mechanicsburg in Mechanicsburg?

Yes, the chargers are listed as open to the public.

Related Pages