LINK 59 LINK 59 BUILDNG

LINK 59 LINK 59 BUILDNG is an EV charging station located at 6007 Euclid Ave, Cleveland, Ohio. It offers 2 charging ports on the ChargePoint Network network.

LINK 59 LINK 59 BUILDNG is an EV charging station in Cleveland, Ohio on the ChargePoint Network network. It has 2 charging ports (2 Level 2 ports) with charging speeds up to 3.7 kW. Access: 24 hours daily.

Location

6007 Euclid Ave
Cleveland, OH 44103

Coordinates: 41.5047700, -81.6484150

Access: public — Public

Network

ChargePoint Network

Charging Details

TypePorts
Level 22

Max power: 3.7 kW

Connector Breakdown

ConnectorLevelPower
J1772Level 2≤19.2 kW

Hours & Access

24 hours daily

Nearby Charging Stations

Frequently Asked Questions

How many charging ports does LINK 59 LINK 59 BUILDNG have?

LINK 59 LINK 59 BUILDNG in Cleveland, Ohio has 2 Level 2 ports on the ChargePoint Network network.

What connector types are available at LINK 59 LINK 59 BUILDNG?

LINK 59 LINK 59 BUILDNG supports the following EV connectors: J1772.

What charging speeds are available at LINK 59 LINK 59 BUILDNG?

LINK 59 LINK 59 BUILDNG provides Level 2 charging at up to 3.7 kW. DC fast charging is not available at this location.

What are the hours for LINK 59 LINK 59 BUILDNG?

LINK 59 LINK 59 BUILDNG is accessible 24 hours daily.

Who can use LINK 59 LINK 59 BUILDNG?

LINK 59 LINK 59 BUILDNG access: public — Public.

Where is LINK 59 LINK 59 BUILDNG located?

LINK 59 LINK 59 BUILDNG is located at 6007 Euclid Ave, Cleveland, OH 44103.

Station Actions

Is This Information Correct?

Station details change frequently. If this station's hours, pricing, or availability are wrong, view on the map and submit a correction to help fellow EV drivers.