Core Sedalia Deer Trail1 — 555 2nd Ave, Deer Trail, CO 80105
Yes. 555 2nd Ave has 2 DC fast public chargers on ChargePoint, up to 125 kW, with CHAdeMO and CCS plugs. Open 24/7. Verified Oct 21, 2026.
2 Charging Ports at This Location
Location Facts
- Network
- ChargePoint
- Hours
- 24 hours daily
- Access
- Public
- Max power
- 125 kW
- Nearest other DC fast
- BDO Public — 22.3 mi, up to 125 kW
- Last verified
Nearest Charging Locations
- Kelver Library 585 South Main Street · Blink · 2 ports · up to 4 kW · 11.4 mi
More ChargePoint Locations Nearby
- BDO Public 1092 Cedar St · ChargePoint · 3 ports · up to 125 kW · 22.3 mi
- BDO Public Bennett 1092 cedar street · ChargePoint · 1 port · up to 125 kW · 22.3 mi
- Core Sedalia Bennetttownhall 207 Muegge Way · ChargePoint · 2 ports · up to 4 kW · 22.8 mi
- Core Sedalia Kiowa Town Hall 404 Comanche Street · ChargePoint · 2 ports · up to 4 kW · 29.0 mi
- Hion Network Limon 250 Main St · ChargePoint · 1 port · up to 400 kW · 31.3 mi
- Core Sedalia Eliz. Town Hall 165 Main St · ChargePoint · 2 ports · up to 4 kW · 34.2 mi
Frequently Asked Questions
How many chargers are at Core Sedalia Deer Trail1 on 555 2nd Ave?
Core Sedalia Deer Trail1 has 2 charging ports: 2 DC fast, on the ChargePoint network.
Which plugs does Core Sedalia Deer Trail1 in Deer Trail have?
CHAdeMO, CCS, with up to 125 kW.
Is there DC fast charging at 555 2nd Ave, Deer Trail, CO 80105?
Yes: 2 DC fast ports, up to 125 kW.
When is Core Sedalia Deer Trail1 in Deer Trail open?
24 hours daily.
Can anyone charge at Core Sedalia Deer Trail1 in Deer Trail?
Yes, the chargers are listed as open to the public.