LANECO LEVITON 2

LANECO LEVITON 2 is an EV charging station located at 50 Peter Kristof Way, Medfield, Massachusetts. It offers 2 charging ports on the ChargePoint Network network.

LANECO LEVITON 2 is an EV charging station in Medfield, Massachusetts on the ChargePoint Network network. It has 2 charging ports (2 Level 2 ports) with charging speeds up to 3.7 kW. Access: 24 hours daily.

Location

50 Peter Kristof Way
Medfield, MA 02052

Coordinates: 42.1923750, -71.3221000

Access: public — Public

Network

ChargePoint Network

Charging Details

TypePorts
Level 22

Max power: 3.7 kW

Connector Breakdown

ConnectorLevelPower
J1772Level 2≤19.2 kW

Hours & Access

24 hours daily

Nearby Charging Stations

Frequently Asked Questions

How many charging ports does LANECO LEVITON 2 have?

LANECO LEVITON 2 in Medfield, Massachusetts has 2 Level 2 ports on the ChargePoint Network network.

What connector types are available at LANECO LEVITON 2?

LANECO LEVITON 2 supports the following EV connectors: J1772.

What charging speeds are available at LANECO LEVITON 2?

LANECO LEVITON 2 provides Level 2 charging at up to 3.7 kW. DC fast charging is not available at this location.

What are the hours for LANECO LEVITON 2?

LANECO LEVITON 2 is accessible 24 hours daily.

Who can use LANECO LEVITON 2?

LANECO LEVITON 2 access: public — Public.

Where is LANECO LEVITON 2 located?

LANECO LEVITON 2 is located at 50 Peter Kristof Way, Medfield, MA 02052.

Station Actions

Is This Information Correct?

Station details change frequently. If this station's hours, pricing, or availability are wrong, view on the map and submit a correction to help fellow EV drivers.