Step One GMC Cadillac Ft Walton Beach — 329 Miracle Strip Parkway Southwest, Fort Walton Beach, FL 32548

Yes. 329 Miracle Strip Parkway Southwest has 4 DC fast public chargers on Blink, up to 4 kW, with CCS plug. Open 24/7. Verified Oct 20, 2026.

4 Charging Ports at This Location

ChargerPortsPlugsMax powerNetworkPriceStatusSourceAccess
Charger 12 DC fastCCS4 kWBlinkNot listedOpen · Verified Oct 20, 2026U.S. DOE (NREL)Public
Charger 22 DC fastCCS4 kWBlinkNot listedOpen · Verified Oct 20, 2026U.S. DOE (NREL)Public

Location Facts

Network
Blink
Hours
24 hours daily
Access
Public
Max power
4 kW
Nearest other DC fast
FPL EVolution — 0.7 mi, up to 50 kW
Last verified

Nearest Charging Locations

More Blink Locations Nearby

Frequently Asked Questions

How many chargers are at Step One GMC Cadillac Ft Walton Beach on 329 Miracle Strip Parkway Southwest?

Step One GMC Cadillac Ft Walton Beach has 4 charging ports: 4 DC fast, on the Blink network.

Which plugs does Step One GMC Cadillac Ft Walton Beach in Fort Walton Beach have?

CCS, with up to 4 kW.

Is there DC fast charging at 329 Miracle Strip Parkway Southwest, Fort Walton Beach, FL 32548?

Yes: 4 DC fast ports, up to 4 kW.

When is Step One GMC Cadillac Ft Walton Beach in Fort Walton Beach open?

24 hours daily.

Can anyone charge at Step One GMC Cadillac Ft Walton Beach in Fort Walton Beach?

Yes, the chargers are listed as open to the public.

Related Pages