Upstate Construction And Building Maintenance — 327 Columbia Turnpike, Rensselaer, NY 12144
Yes. 327 Columbia Turnpike has 4 Level 2 public chargers on QuickCharge, with J1772 plug. Open 24/7. Verified Oct 13, 2026.
4 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 4 Level 2 | J1772 | Not listed | QuickCharge | Not listed | Open · Verified Oct 13, 2026 | U.S. DOE (NREL) | Public |
Location Facts
- Network
- QuickCharge
- Hours
- 24 hours daily
- Access
- Public
- Nearest DC fast alternative
- Hannaford Plaza — 1.2 mi, up to 350 kW
- Last verified
Nearest Charging Locations
- Noppers Repair Noppers 323 Columbia Turnpike · ChargePoint · 2 ports · up to 4 kW · 0.1 mi
- Matchless Stove Rensselaer 300 Columbia Turnpike · QuickCharge · 4 ports · 0.2 mi
- Forrest Pointe 1 Forrest Pointe Drive · ViaLynk · 16 ports · 0.5 mi
- East Greenbush Motor Vehicles 225 Columbia Tpke · SWTCH Energy · 6 ports · up to 4 kW · 0.5 mi
- Martin Electric 164 Columbia Turnpike · QuickCharge · 4 ports · 0.8 mi
- Town Center Columbia Turnpike Building 578 Columbia Turnpike · QuickCharge · 2 ports · 1.0 mi
- Regeneron 85 Discovery Drive · ChargePoint · 4 ports · 1.0 mi
- Regeneron 85 Discovery Drive · ChargePoint · 2 ports · 1.0 mi
- Town Center Columbia Turnpike Building 590 Columbia Turnpike · QuickCharge · 2 ports · 1.0 mi
- Town Center Columbia Turnpike Building 580 Columbia Turnpike · QuickCharge · 2 ports · 1.1 mi
More QuickCharge Locations Nearby
- Holiday Inn Express 8 Empire Dr · QuickCharge · 10 ports · 1.8 mi
- Residence Inn East Greenbush 3 Tech Valley Dr · QuickCharge · 4 ports · 1.8 mi
- Country Inn & Suites By Radisson 300 Broadway · QuickCharge · 8 ports · 2.7 mi
- Suny Administration Parking Garage 353 Broadway · QuickCharge · 10 ports · 2.8 mi
- Redburn Columbia St 39 Columbia St · QuickCharge · 4 ports · 3.1 mi
- QuickCharge EV Charging 20 Forbes Ave · QuickCharge · 20 ports · 3.3 mi
Frequently Asked Questions
How many chargers are at Upstate Construction And Building Maintenance on 327 Columbia Turnpike?
Upstate Construction And Building Maintenance has 4 charging ports: 4 Level 2, on the QuickCharge network.
Which plugs does Upstate Construction And Building Maintenance in Rensselaer have?
J1772.
Is there DC fast charging at 327 Columbia Turnpike, Rensselaer, NY 12144?
No. Upstate Construction And Building Maintenance has Level 2 charging only (4 ports). The nearest DC fast charging is Hannaford Plaza, 1.2 mi away.
When is Upstate Construction And Building Maintenance in Rensselaer open?
24 hours daily.
Can anyone charge at Upstate Construction And Building Maintenance in Rensselaer?
Yes, the chargers are listed as open to the public.