Newnan Utilities Wahoo Creek Administration Building — 315 Millard Farmer Industrial Blvd, Newnan, GA 30263
Yes. 315 Millard Farmer Industrial Blvd has 2 Level 2 public chargers, up to 4 kW, with J1772 plug. Free. Verified Aug 11, 2026.
2 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 2 Level 2 | J1772 | 4 kW | Non-networked | Free | Open · Verified Aug 11, 2026 | U.S. DOE (NREL) | Public |
Location Facts
- Pricing
- Free
- Hours
- 8am-5pm M-F
- Access
- Public
- Max power
- 4 kW
- Nearest DC fast alternative
- Tesla Supercharger — 1.6 mi, up to 7 kW
- Last verified
Nearest Charging Locations
- Tesla Supercharger 555 Bullsboro Drive · Tesla · 12 ports · up to 7 kW · 1.6 mi
- Home2 Suites by Hilton Newnan 4551 McIntosh Pkwy · Tesla Destination · 2 ports · up to 8 kW · 1.7 mi
- McDaniels Acura of Newnan 8000 McIntosh Parkway · Blink · 2 ports · up to 4 kW · 1.8 mi
- Nissan of Newnan 783 Bullsboro Dr · 2 ports · up to 50 kW · 2.0 mi
- City of Newnan 25 LaGrange St · 1 port · up to 4 kW · 2.1 mi
- Division HQ EV Bonnell 37 Lagrange St · ChargePoint · 2 ports · up to 4 kW · 2.2 mi
- EV Connect EV Charging 955 Bullsboro Dr · EV Connect · 4 ports · 2.3 mi
- Store 1751 Newman Crossing Boulevard E · Blink · 2 ports · up to 4 kW · 2.4 mi
- Carl Miller Park 74 Sewell Rd · 2 ports · up to 4 kW · 3.0 mi
- Mbas Newnan Two 152 Doc Turner Wy · ChargePoint · 1 port · 3.0 mi
Frequently Asked Questions
How many chargers are at Newnan Utilities Wahoo Creek Administration Building on 315 Millard Farmer Industrial Blvd?
Newnan Utilities Wahoo Creek Administration Building has 2 charging ports: 2 Level 2.
Which plugs does Newnan Utilities Wahoo Creek Administration Building in Newnan have?
J1772, with up to 4 kW.
Is there DC fast charging at 315 Millard Farmer Industrial Blvd, Newnan, GA 30263?
No. Newnan Utilities Wahoo Creek Administration Building has Level 2 charging only (2 ports). The nearest DC fast charging is Tesla Supercharger, 1.6 mi away.
How much does charging cost at Newnan Utilities Wahoo Creek Administration Building, Newnan?
Free (as listed Aug 11, 2026).
When is Newnan Utilities Wahoo Creek Administration Building in Newnan open?
8am-5pm M-F.
Can anyone charge at Newnan Utilities Wahoo Creek Administration Building in Newnan?
Yes, the chargers are listed as open to the public.