Integrative
Sausalito, CA
Status unknown — be the first to check in
Did it work?
Be the first to say if charging worked here.
Nearby chargers
More details
Address
3000 BridgewaySausalito, CA 94965
Location Facts
- Working-Now Score
- 70 of 100 (how it works)
- Nearest DC fast alternative
- Intertie Bridgeway — 0.1 mi (2 min drive), up to 75 kW
- Share of Sausalito charging
- Integrative is one of 10 charging locations ChargingNear.me lists in Sausalito, CA. 1 location in Sausalito has DC fast charging.
Data Sources
Integrative at 3000 Bridgeway in Sausalito, CA is a listed EV charging location; its sources do not list a port count yet. Nearest DC fast charger: Intertie Bridgeway, 0.1 miles away (2 min by car). 7 other fast-charging locations within 5 miles are in service per DOE AFDC. Integrative was first listed on Apr 26, 2026.
ChargingNear.me lists Integrative, 3000 Bridgeway, Sausalito, CA as a public EV charging location (ChargingNear.me verification data, updated Apr 26, 2026).
Best by Need
| Need | Location | Distance | Why |
|---|---|---|---|
| Fastest | San Marin Plaza 155 San Marin Dr, Novato | 18.3 miles | up to 500 kW · 8 DC fast ports · NACS |
| Cheapest per kWh | Airport Corporate Center 7677 Oakport St, Oakland | 18.4 miles | $0.20/kWh listed (as of Sep 12, 2024) · 36 Level 2 ports |
| Free | Dunphy Park 1621 Bridgeway, Sausalito | 1.0 miles | Listed as free · 6 Level 2 ports |
| Open 24 hours | Sausalito Mcsd MLK 33 Buchanan Drive, Sausalito | 0.4 miles | Listed as open 24 hours · 1 Level 2 port · up to 8 kW |
| Tesla Supercharger | Tesla Supercharger 190 Donahue Street, Marin City | 0.4 miles | 16 DC fast ports · up to 72 kW |
| Non-Tesla fast (CCS) | Intertie Bridgeway Suite B-2656 Bridgeway, Sausalito | 0.1 miles | Intertie · 2 DC fast ports · up to 75 kW |
Source: DOE AFDC and Open Charge Map data, updated Nov 22, 2026.
Chargers at This Location
- Charger 1 · Station operator
Source: ChargingNear.me verification data, updated Apr 26, 2026.
Highway Corridor and NEVI
With no DC fast ports here, the nearest fast alternative, Intertie Bridgeway (0.1 miles away), is 0.3 miles from US-101 (corridor-ready) and fails the NEVI check: 2 CCS ports (needs 4).
Source: ChargingNear.me NEVI-grade file (DOE AFDC, FHWA corridors), Nov 22, 2026.
Nearest Charging Locations
- Intertie HQ 475 Coloma St · Intertie · 2 ports · up to 7 kW · under 0.1 mi · 2 min drive
- Berg Holdings Marinship Way 2330 Marinship Way · ChargePoint · 2 ports · up to 7 kW · 0.4 mi
- Sausalito Mcsd MLK 33 Buchanan Drive · ChargePoint · 1 port · up to 8 kW · 0.4 mi
- Sausalito Mcsd MLK 636 Nevada Street · ChargePoint · 2 ports · up to 8 kW · 0.4 mi
- Liberty Ship Wy 30 Liberty Ship Way · Loop · 3 ports · up to 8 kW · 0.8 mi
- Dunphy Park 1621 Bridgeway · Tesla Destination · 6 ports · up to 12 kW · 1.0 mi
- ChargePoint EV Charging 475 E Strawberry Dr · Mill Valley · ChargePoint · 2 ports · up to 4 kW · 1.0 mi
- Sausalito City Hall 420 Litho St · Tesla Destination · 4 ports · up to 10 kW · 1.0 mi
Nearest Fast Chargers to Integrative
- Intertie Bridgeway Suite B-2656 Bridgeway · Sausalito, CA · Intertie · 2 DC fast ports · up to 75 kW · 0.1 mi · 2 min drive · Working-Now Score 80
- Tesla Supercharger 190 Donahue Street · Marin City, CA · Tesla · 16 DC fast ports · up to 72 kW · 0.5 mi · Working-Now Score 70
- Tesla Supercharger 800 Strawberry Village · Mill Valley, CA · Tesla · 12 DC fast ports · up to 325 kW · 2.0 mi · Working-Now Score 70
- Safeway 1 Camino Alto · Mill Valley, CA · Electrify America · 3 DC fast ports · up to 350 kW · 2.2 mi · Working-Now Score 80
- Whole Foods Mill Valley 731 E Blithedale Ave · Mill Valley, CA · EVgo · 3 DC fast ports · up to 50 kW · 2.6 mi · Working-Now Score 80
Working-Now Score (0–100) comes from each station's listed status, recent confirmations and driver check-ins. How the score works.
Networks and Plugs Within 5 Miles of Integrative
38 charging locations within 5 miles.
By network
- ChargePoint: 18 locations
- Tesla Destination: 4 locations
- Tesla: 3 locations
- Blink: 2 locations
- Intertie: 2 locations
- Non-networked: 2 locations
- Rivian Waypoints: 2 locations
- Electrify America: 1 location
By plug
Road-Trip Routes Near Integrative
- San Francisco, CA to Los Angeles, CA passes 8.0 mi away
- San Francisco, CA to South Lake Tahoe, CA passes 8.0 mi away
- San Francisco, CA to Yosemite Valley, CA passes 8.0 mi away
- Los Angeles, CA to San Francisco, CA passes 8.0 mi away
Straight-line distances, counts and Working-Now Scores: ChargingNear.me, from DOE AFDC and Open Charge Map data, updated Nov 22, 2026. Drive times: ChargingNear.me estimates by car on OpenStreetMap roads (Stadia Maps routing), Nov 9, 2026.
Questions About Integrative
How much does it cost to charge at Integrative?
DOE AFDC does not list a price for Integrative at 3000 Bridgeway in Sausalito, CA. The site host sets the price, and the charger's screen or the host can confirm it before you plug in. Level 2 sessions are often billed per hour or per kWh, and some hosts offer them free to customers.
What are the hours at Integrative in Sausalito?
DOE AFDC does not list opening hours for Integrative at 3000 Bridgeway in Sausalito, CA. Integrative was first listed on Apr 26, 2026. Source: ChargingNear.me verification data, updated Apr 26, 2026. Drive times are ChargingNear.me estimates on OpenStreetMap roads. Check the charger's screen before you plug in, since equipment and prices can change.
What's the nearest DC fast charger to Integrative?
Integrative has no DC fast ports listed, only slower charging. The nearest DC fast charger is Intertie Bridgeway at Suite B-2656 Bridgeway, Sausalito, 0.1 miles away (2 min by car), with 2 DC fast ports at up to 75 kW. That site is 0.3 miles from US-101, an FHWA-designated EV corridor. Other fast options nearby: Tesla Supercharger on 190 Donahue Street (0.5 miles, 16 ports) and Tesla Supercharger on 800 Strawberry Village (2 miles, 12 ports).
Where else can I charge near Integrative in Sausalito?
ChargingNear.me lists 10 charging locations with 25 ports in Sausalito, CA, and 1 of them have DC fast charging. The closest to Integrative is Intertie HQ at 475 Coloma St, Sausalito, less than 0.1 miles away (2 min by car). Next is Intertie Bridgeway at Suite B-2656 Bridgeway, Sausalito, 0.1 miles away (2 min by car). Within 5 miles there are 38 charging locations; the most common networks are ChargePoint (18), Tesla Destination (4) and Tesla (3).
Who can charge at Integrative?
The sources for Integrative at 3000 Bridgeway in Sausalito, CA do not say who may use the chargers. If you cannot charge here, Intertie HQ at 475 Coloma St, Sausalito is less than 0.1 miles away (2 min by car). Integrative was first listed on Apr 26, 2026.
