Broadcom Office Building — 2860 Junction Ave, San Jose, CA 95134
Yes. 2860 Junction Ave has 12 Level 2 public chargers on PowerFlex, up to 4 kW, with J1772 plug. Open 24/7, $0.20/kWh. Verified Nov 11, 2025.
12 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 12 Level 2 | J1772 | 4 kW | PowerFlex | $0.20/kWh | Open · Verified Nov 11, 2025 | U.S. DOE (NREL) | Public |
Location Facts
Nearest Charging Locations
- Kepler HQ Station West 617 River Oaks Parkway · ChargePoint · 4 ports · 0.3 mi
- NIO USA 3151 Zanker Rd · Chaevi · 10 ports · up to 50 kW · 0.3 mi
- Preylock Zanker Road Lot 2860 Zanker Rd · Electrify America · 6 ports · up to 350 kW · 0.3 mi
- Aire Leasing 3401 Iron Point Dr · ChargePoint · 2 ports · up to 4 kW · 0.4 mi
- Chaevi Test 3003 North 1st Street · Chaevi · 4 ports · 0.6 mi
- ABB San Jose 3055 Orchard Dr · EVgo · 2 ports · up to 40 kW · 0.6 mi
- American Red Cross 2731 N 1st St · 4 ports · up to 4 kW · 0.7 mi
- VTA River Oaks 3331 N 1st St · ChargePoint · 2 ports · up to 4 kW · 0.7 mi
- VTA River Oaks 3351 N First St · ChargePoint · 12 ports · up to 4 kW · 0.7 mi
- VTA River Oaks 3331 N First St · ChargePoint · 2 ports · up to 4 kW · 0.7 mi
More PowerFlex Locations Nearby
- PF CA KCR Pac Rim 1688 Hostetter Rd · PowerFlex · 12 ports · up to 50 kW · 2.5 mi
- Mission College 3000 Mission College Blvd · PowerFlex · 53 ports · up to 50 kW · 3.0 mi
- PF SJSU North Garage S 9th St · PowerFlex · 30 ports · up to 3 kW · 4.9 mi
- The Harker School 500 Saratoga Ave · PowerFlex · 15 ports · up to 4 kW · 6.2 mi
- PF SJSU S Garage 1278 S 10th St · PowerFlex · 30 ports · up to 50 kW · 6.4 mi
- Blackford Learning Center 3800 Blackford Ave · PowerFlex · 50 ports · up to 4 kW · 6.4 mi
Frequently Asked Questions
How many chargers are at Broadcom Office Building on 2860 Junction Ave?
Broadcom Office Building has 12 charging ports: 12 Level 2, on the PowerFlex network.
Which plugs does Broadcom Office Building in San Jose have?
J1772, with up to 4 kW.
Is there DC fast charging at 2860 Junction Ave, San Jose, CA 95134?
No. Broadcom Office Building has Level 2 charging only (12 ports). The nearest DC fast charging is NIO USA, 0.3 mi away.
How much does charging cost at Broadcom Office Building, San Jose?
$0.20 per kWh (as listed Nov 11, 2025).
When is Broadcom Office Building in San Jose open?
24 hours daily.
Can anyone charge at Broadcom Office Building in San Jose?
Yes, the chargers are listed as open to the public.