JBT Madera — 2300 Industrial Avenue, Madera, CA 93637
Yes. 2300 Industrial Avenue has 3 Level 2 public chargers on Blink, up to 4 kW, with J1772 plug. Open 24/7. Verified Oct 21, 2026.
3 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 3 Level 2 | J1772 | 4 kW | Blink | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
Location Facts
Nearest Charging Locations
- Save Mart 1504 Howard Rd · EVgo · 2 ports · up to 50 kW · 0.6 mi
- Madera County Floor 200 N G St · ChargePoint · 4 ports · up to 4 kW · 1.6 mi
- Caltrans Maintenance 125 W Almond Ave · 4 ports · up to 50 kW · 1.6 mi
- The Vineyard Restaurant 605 South I St. · EVCS · 4 ports · up to 50 kW · 1.6 mi
- US Bank Madera 201 N D St · EVCS · 1 port · up to 50 kW · 1.8 mi
- Walmart 1977 W Cleveland Avenue · Electrify America · 6 ports · up to 350 kW · 1.9 mi
- Madera County RD 14190 Rd 28 · ChargePoint · 4 ports · up to 4 kW · 2.8 mi
- The Crossroads Shopping Mall 1426 E Yosemite Ave · EVgo · 6 ports · up to 50 kW · 2.8 mi
- Mdss HSS 1626 Sunrise Ave · ChargePoint · 4 ports · up to 4 kW · 2.8 mi
- Madera County HSS 1604 Sunrise Ave · ChargePoint · 1 port · 2.9 mi
More Blink Locations Nearby
- Raising Canes 6791 North Weber Avenue · Blink · 2 ports · up to 4 kW · 12.4 mi
- Fresno Sequioa Hospital 7300 North Fresno Street · Blink · 10 ports · 18.4 mi
- Prieto Automotive 5499 North Blackstone Avenue · Blink · 2 ports · up to 4 kW · 18.7 mi
- Lithia Fresno 5212 N Blackstone Ave · Blink · 1 port · up to 4 kW · 18.9 mi
- Fresno Medical Center Parking Lot 4785 North First Street · Blink · 4 ports · up to 4 kW · 20.0 mi
- Chawanakee Unified School District 26065 Outback Industrial Way · Blink · 2 ports · up to 50 kW · 23.1 mi
Frequently Asked Questions
How many chargers are at JBT Madera on 2300 Industrial Avenue?
JBT Madera has 3 charging ports: 3 Level 2, on the Blink network.
Which plugs does JBT Madera in Madera have?
J1772, with up to 4 kW.
Is there DC fast charging at 2300 Industrial Avenue, Madera, CA 93637?
No. JBT Madera has Level 2 charging only (3 ports). The nearest DC fast charging is Save Mart, 0.6 mi away.
When is JBT Madera in Madera open?
24 hours daily.
Can anyone charge at JBT Madera in Madera?
Yes, the chargers are listed as open to the public.