Ucsf Campus — 225 California Dr, Burlingame, CA 94010
Yes. 225 California Dr has 6 Level 2 public chargers on ChargePoint, up to 4 kW, with J1772 plug. Open 24/7. Verified Oct 21, 2026.
6 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
| Charger 2 | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
| Ucsf Campus Ucsf | 1 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
| Ucsf Campus Ucsf | 1 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
Location Facts
- Network
- ChargePoint
- Hours
- 24 hours daily
- Access
- Public
- Max power
- 4 kW
- Nearest DC fast alternative
- Putnam Cadillac — under 0.1 mi
- Last verified
Nearest Charging Locations
- Burlingame Lot 294-298 California Dr · ChargePoint · 2 ports · up to 4 kW · under 0.1 mi
- Putnam Cadillac 198 California Drive · EV Connect · 1 port · under 0.1 mi
- ChargePoint EV Charging 220 Park Rd · ChargePoint · 18 ports · up to 4 kW · 0.1 mi
- Nissan of Burlingame 101 California Dr · 1 port · up to 4 kW · 0.2 mi
- Burlingame Main Library 1258 Donnelly Ave · PowerFlex · 6 ports · up to 50 kW · 0.2 mi
- Burlingame Library 480 Primrose Rd · PowerFlex · 6 ports · up to 50 kW · 0.2 mi
- Smuhsd BHS 1 Mangini Way · ChargePoint · 12 ports · 0.3 mi
- Burlingame City Hall 501 Primrose Rd · ChargePoint · 2 ports · up to 4 kW · 0.3 mi
- Grand Blvd Thomas Fung. 340 Grand Blvd · ChargePoint · 1 port · up to 4 kW · 0.7 mi
- Smuhsd DO 650 N Delaware St · ChargePoint · 14 ports · up to 3 kW · 0.7 mi
More ChargePoint Locations Nearby
- Hilton San Fran 600 Airport Blvd · ChargePoint · 10 ports · up to 4 kW · 0.8 mi
- Smuhsd Smhs 506 North Delaware Street · ChargePoint · 12 ports · 0.8 mi
- Meta 311 Airport Blvd. · ChargePoint · 44 ports · up to 4 kW · 0.9 mi
- Meta ADA 333 Airport Blvd. · ChargePoint · 17 ports · up to 4 kW · 0.9 mi
- Meta 312 Airport Blvd. · ChargePoint · 10 ports · up to 4 kW · 0.9 mi
- Meta 322 Airport Blvd. · ChargePoint · 16 ports · up to 4 kW · 0.9 mi
Frequently Asked Questions
How many chargers are at Ucsf Campus on 225 California Dr?
Ucsf Campus has 6 charging ports: 6 Level 2, on the ChargePoint network.
Which plugs does Ucsf Campus in Burlingame have?
J1772, with up to 4 kW.
Is there DC fast charging at 225 California Dr, Burlingame, CA 94010?
No. Ucsf Campus has Level 2 charging only (6 ports). The nearest DC fast charging is Putnam Cadillac, under 0.1 mi away.
When is Ucsf Campus in Burlingame open?
24 hours daily.
Can anyone charge at Ucsf Campus in Burlingame?
Yes, the chargers are listed as open to the public.