Bridges at Mallard Creek - 2231 Keaton Ave
Bridges at Mallard Creek - 2231 Keaton Ave is an EV charging station located at 2231 Keaton Ave, Charlotte, North Carolina. It offers 2 charging ports on the LOOP network.
Bridges at Mallard Creek - 2231 Keaton Ave is an EV charging station in Charlotte, North Carolina on the LOOP network. It has 2 charging ports (2 Level 2 ports) with charging speeds up to 3.7 kW. Pricing: $1 activation fee; $0.25 per kWh. Access: 24 hours daily.
Location
2231 Keaton AveCharlotte, NC 28269
Coordinates: 35.3199250, -80.7818630
Access: public — Public - Credit card at all times
Network
LOOP
Charging Details
| Type | Ports |
|---|---|
| Level 2 | 2 |
Max power: 3.7 kW
Connector Breakdown
| Connector | Level | Power |
|---|---|---|
| J1772 | Level 2 | ≤19.2 kW |
Pricing
$0.25/kWh as of March 12, 2026
$1 activation fee; $0.25 per kWh
Hours & Access
24 hours daily
Nearby Charging Stations
-
IKEA USA CHARLOTTE 1
— ChargePoint Network
(2 L2)
8300 Ikea Blvd -
Walmart 2134 (Charlotte, NC)
— Electrify America
(10 DCFC)
7735 North Tryon Street -
The Grayson Apartment Homes
— LOOP
(6 L2)
6001 Bennettsville Ln -
CHARLOTTE, NC CMPD UC EV-1
— ChargePoint Network
(2 L2)
8452 N Tryon St -
University of North Carolina Charlotte - South Village Parking Deck
— Non-Networked
(12 L2)
8880 Johnson Alumni Way -
Hilton Charlotte University Place - Tesla Destination
— Tesla Destination
(6 L2)
8629 JM Keynes Dr
Frequently Asked Questions
How many charging ports does Bridges at Mallard Creek - 2231 Keaton Ave have?
Bridges at Mallard Creek - 2231 Keaton Ave in Charlotte, North Carolina has 2 Level 2 ports on the LOOP network.
What connector types are available at Bridges at Mallard Creek - 2231 Keaton Ave?
Bridges at Mallard Creek - 2231 Keaton Ave supports the following EV connectors: J1772.
What charging speeds are available at Bridges at Mallard Creek - 2231 Keaton Ave?
Bridges at Mallard Creek - 2231 Keaton Ave provides Level 2 charging at up to 3.7 kW. DC fast charging is not available at this location.
How much does it cost to charge at Bridges at Mallard Creek - 2231 Keaton Ave?
Charging at Bridges at Mallard Creek - 2231 Keaton Ave costs $1 activation fee; $0.25 per kWh (as of March 12, 2026).
What are the hours for Bridges at Mallard Creek - 2231 Keaton Ave?
Bridges at Mallard Creek - 2231 Keaton Ave is accessible 24 hours daily.
Who can use Bridges at Mallard Creek - 2231 Keaton Ave?
Bridges at Mallard Creek - 2231 Keaton Ave access: public — Public - Credit card at all times.
Where is Bridges at Mallard Creek - 2231 Keaton Ave located?
Bridges at Mallard Creek - 2231 Keaton Ave is located at 2231 Keaton Ave, Charlotte, NC 28269.
Station Actions
Is This Information Correct?
Station details change frequently. If this station's hours, pricing, or availability are wrong, view on the map and submit a correction to help fellow EV drivers.